- 2062 Kartik (old course) · 8 marks
Crest level of fall, Q 30 m3/s
Short answer
Crest level 113.55 m; head over crest H = 1.457 m, crest 1.55 m above canal bed.
Following data were observed in a canal fall: FSL of canal = 115 m; Bed level of canal = 112 m; Bed width of canal = 15 m; Design discharge = 30 m³/s; Side slope of canal = 2:1; Length of rectangular crest of the fall = 10 m (Broad crested weir). Calculate the crest level of the fall.
For a rectangular broad-crested weir with free flow, the discharge is , where is the total head over the crest including the velocity head of approach. The crest level is the u/s energy level minus this head.
Data
m³/s, canal FSL 115.00 m, bed level 112.00 m (depth m), bed width m, side slope 2:1, crest length m.
Step 1. Approach velocity
Step 2. Head over the crest
Step 3. Crest level
The crest is 1.55 m above the canal bed. Check: the head over the crest measured from the FSL is m; adding the velocity head of 0.012 m gives m.
Answer: crest level m (head over crest m).
FSL 115.0 ~~~~~~~~~~~~~~~~~~~~~
____ crest 113.55 m
bed 112.0 _______| |________
L = 10 m, broad crest
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Vertical drop crest level and width, Q 30 · Irrigation and Drainage Engineering, chapter 7
- Crest width, cistern length of vertical drop, Q 1.55 · Irrigation and Drainage Engineering, chapter 7 · asked 2×
- Sarda fall: Q 8, FSL 218.30 · Irrigation and Drainage Engineering, chapter 7
- Sarda fall: Q 12, bed level 103 m · Irrigation and Drainage Engineering, chapter 7
- Vertical drop design, Q 1.8 m3/s (bed 205.05) · Irrigation and Drainage Engineering, chapter 7 · asked 4×
- Canal fall design, Q 12, drop 1.5 m · Irrigation and Drainage Engineering, chapter 7
- Economical rectangular condition and trapezoidal bed slope · Hydro Power, chapter 1
- Best hydraulic rectangular canal design · Hydro Power, chapter 1
- Phreatic line and discharge (crest 300 masl) · Hydropower Engineering, chapter 4 · asked 2×
- Design of side intake with trashrack · Hydropower Engineering, chapter 5
All Irrigation and Drainage Engineering chapter 7 questions →