- 2070 Bhadra · 6 marks
Siphon aqueduct: Q 20, drainage 200
Short answer
Drainage waterway 72 m clear (9 spans @8 m, overall 81.6 m). Canal trough width 7 m, depth 1.5 m, velocity 1.905 m/s. Inlet transition 9.5 m (2:1), outlet 14.2 m (3:1). Uplift resisted by 0.6 m thick slab with soffit at 149.16 m; cut-offs and aprons provided.
Following data are obtained at the crossing of a canal and a drainage. Canal data: Q = 20 m³/s, depth of water = 1.5 m and FSL = 151.50 m, Bed width = 12 m, side slope (H:V) = (1.5:1). Drainage data: Q = 200 m³/s, HFL = 150.7 m, Bed level = 148.5 m and Ground level = 150.0 m. Design the following components of siphon aqueduct. i) Drainage waterway ii) Canal waterway iii) Transition iv) Uplift.
The canal ( = 20 m³/s) crosses a drainage of = 200 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Bed level of canal = FSL − depth = 151.50 − 1.50 = 150.00 m; Lacey's = 1; trough = 0.015; slab 0.6 m, concrete 24 kN/m³.
1. Type of structure
HFL of the drainage (150.70 m) is above the canal bed (150.00 m) by 0.70 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 150.70 − 148.50 = 2.20 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 9 spans of 8 m with piers 1.2 m thick: clear waterway = 9 × 8 = 72 m (> 67.2 m). Overall length = 72 + 8 × 1.2 = 81.6 m.
Check: mean velocity = Q/(L·d) = 200/(72 × 2.20) = 1.26 m/s. Lacey's regime depth = 2.75 m (with = 1); foundations of piers and abutments are taken about 1.5R = 4.1 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (12 + 1.5 × 1.5) × 1.5 = 21.38 m², = 20/21.38 = 0.936 m/s, = 0.0446 m. Top width = 16.50 m.
To save cost, the canal is flumed to a rectangular trough of width = 7 m, with the same full supply depth 1.5 m (the trough is as long as the drainage waterway, 81.6 m).
- Trough area = 7 × 1.5 = 10.50 m²; = 20/10.50 = 1.905 m/s (acceptable, < 2.5 m/s); = 0.1849 m
- Froude number = 0.50 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 10.50/10.00 = 1.050 m; friction slope = 0.000765 (Manning's n = 0.015); friction loss in trough = 0.000765 × 81.6 = 0.062 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 16.50 − 7 = 9.5 m
- Outlet length = 3 × (T − B_t)/2 = 14.2 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 151.500 m, so = 151.318 m, = 151.255 m, = 151.325 m. Trough bed = water level − 1.5 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 150.000 | 151.500 |
| 2 | End of inlet transition = start of trough | 149.818 | 151.318 |
| 3 | End of trough = start of outlet transition | 149.755 | 151.255 |
| 4 | End of outlet transition = normal canal | 149.825 | 151.325 |
Total loss of head = 151.500 − 151.325 = 0.175 m, so the canal bed downstream of the work is 0.175 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 149.16 m, i.e. 0.66 m above the drainage bed; HFL stands 1.54 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 147.66 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Uplift on the roof (trough slab)
Upward pressure under the slab (barrel running full) = γ_w (HFL − soffit) = 9.81 × (150.70 − 149.16) = 15.2 kN/m².
Downward load = slab weight 24 × 0.6 = 14.4 kN/m² plus canal water 9.81 × 1.5 = 14.7 kN/m², total 29.1 kN/m².
Uplift exceeds the slab weight but not the total load: net downward = 14.0 kN/m² with canal running. With the canal dry the net uplift is 0.8 kN/m², which the slab and its anchorage to the piers must resist.
Answer: drainage waterway 72 m clear (9 × 8 m, overall 81.6 m); canal flumed to 7 m wide trough; bed/FSL at the four sections = 150.00/151.50, 149.82/151.32, 149.76/151.26, 149.83/151.33 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Siphon aqueduct: Q 20, FSL 251.5 · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 50, bed 32 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon: canal 50, FSL 201.80, RCC flumed · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 60, bed 35 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 30, bed 24 m · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6