- 2078 Baisakh · 8 marks
Cross drainage waterway and transitions, Q 56
Short answer
Siphon aqueduct selected as HFL (268.20m) exceeds canal bed (267.00m). Drainage waterway: 13 spans of 8m (clear 104m) using Lacey's regime perimeter. Canal flumed to 16m wide rectangular trough (1.98m depth). Transitions: inlet 2:1 (13.9m), outlet 3:1 (20.9m). Bed levels/FSL: Sec1 (267.000/268.980), Sec2 (266.866/268.846), Sec3 (266.821/268.801), Sec4 (266.872/268.852). Head loss 0.128m.
Design drainage waterway, canal waterway and canal transitions of a cross drainage work for a canal having discharge 56 m³/s, bed width 24 m, full supply depth 1.98 m, and bed level 267.00 m. The drainage has a high flood discharge of 425 m³/s, high flood level of 268.20 m, general bed level of low water cross-section of 265.50 m, and general ground level of 267.20 m.
The canal ( = 56 m³/s) crosses a drainage of = 425 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Side slope of canal 1.5:1; Lacey's = 1; trough = 0.015.
1. Type of structure
HFL of the drainage (268.20 m) is above the canal bed (267.00 m) by 1.20 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 268.20 − 265.50 = 2.70 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 13 spans of 8 m with piers 1.2 m thick: clear waterway = 13 × 8 = 104 m (> 97.9 m). Overall length = 104 + 12 × 1.2 = 118.4 m.
Check: mean velocity = Q/(L·d) = 425/(104 × 2.70) = 1.51 m/s. Lacey's regime depth = 3.53 m (with = 1); foundations of piers and abutments are taken about 1.5R = 5.3 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (24 + 1.5 × 1.98) × 1.98 = 53.40 m², = 56/53.40 = 1.049 m/s, = 0.0561 m. Top width = 29.94 m.
To save cost, the canal is flumed to a rectangular trough of width = 16 m, with the same full supply depth 1.98 m (the trough is as long as the drainage waterway, 118.4 m).
- Trough area = 16 × 1.98 = 31.68 m²; = 56/31.68 = 1.768 m/s (acceptable, < 2.5 m/s); = 0.1593 m
- Froude number = 0.40 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 31.68/19.96 = 1.587 m; friction slope = 0.000380 (Manning's n = 0.015); friction loss in trough = 0.000380 × 118.4 = 0.045 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 29.94 − 16 = 13.9 m
- Outlet length = 3 × (T − B_t)/2 = 20.9 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 268.980 m, so = 268.846 m, = 268.801 m, = 268.852 m. Trough bed = water level − 1.98 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 267.000 | 268.980 |
| 2 | End of inlet transition = start of trough | 266.866 | 268.846 |
| 3 | End of trough = start of outlet transition | 266.821 | 268.801 |
| 4 | End of outlet transition = normal canal | 266.872 | 268.852 |
Total loss of head = 268.980 − 268.852 = 0.128 m, so the canal bed downstream of the work is 0.128 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 266.22 m, i.e. 0.72 m above the drainage bed; HFL stands 1.98 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 264.72 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Answer: drainage waterway 104 m clear (13 × 8 m, overall 118.4 m); canal flumed to 16 m wide trough; bed/FSL at the four sections = 267.00/268.98, 266.87/268.85, 266.82/268.80, 266.87/268.85 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Siphon aqueduct: Q 30, bed 24 m · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, HFD 550 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 450 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 30, HFL 311 m · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: canal 125, drainage 64 · Irrigation and Drainage Engineering, chapter 8
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6