- Asked 2/34
- 2078 Chaitra · 8 marks
Cross drainage: Q 50, HFD 400, d 1.55 m
Short answer
Drainage waterway: 12 spans of 8 m, clear waterway 96 m. Canal waterway: flumed trough 18 m wide, 1.55 m deep. Inlet transition 2:1 splay 16.6 m; outlet 3:1 splay 25.0 m. Bed levels: 300.000, 299.853, 299.799, 299.855 m; head loss 0.145 m.
Design the following components of a suitable C/D work for the following data: Discharge of canal = 50 m³/s, Bed width of canal = 30 m, Depth of water in canal = 1.55 m, Bed level of canal = 300.0 m, High flood discharge of drain = 400 m³/s, High flood level of drainage = 300.50 m, Bed level of drainage = 298.8 m, General ground level = 300.0 m. i) Design of drainage water-way ii) Design of canal water way iii) Design of transition iv) Design of bed levels.
The canal ( = 50 m³/s) crosses a drainage of = 400 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Side slope not given, taken 1.5:1; Lacey's = 1; trough = 0.015.
1. Type of structure
HFL of the drainage (300.50 m) is above the canal bed (300.00 m) by 0.50 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 300.50 − 298.80 = 1.70 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 12 spans of 8 m with piers 1.2 m thick: clear waterway = 12 × 8 = 96 m (> 95.0 m). Overall length = 96 + 11 × 1.2 = 109.2 m.
Check: mean velocity = Q/(L·d) = 400/(96 × 1.70) = 2.45 m/s. Lacey's regime depth = 3.46 m (with = 1); foundations of piers and abutments are taken about 1.5R = 5.2 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (30 + 1.5 × 1.55) × 1.55 = 50.10 m², = 50/50.10 = 0.998 m/s, = 0.0508 m. Top width = 34.65 m.
To save cost, the canal is flumed to a rectangular trough of width = 18 m, with the same full supply depth 1.55 m (the trough is as long as the drainage waterway, 109.2 m).
- Trough area = 18 × 1.55 = 27.90 m²; = 50/27.90 = 1.792 m/s (acceptable, < 2.5 m/s); = 0.1637 m
- Froude number = 0.46 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 27.90/21.10 = 1.322 m; friction slope = 0.000498 (Manning's n = 0.015); friction loss in trough = 0.000498 × 109.2 = 0.054 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 34.65 − 18 = 16.6 m
- Outlet length = 3 × (T − B_t)/2 = 25.0 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 301.550 m, so = 301.403 m, = 301.349 m, = 301.405 m. Trough bed = water level − 1.55 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 300.000 | 301.550 |
| 2 | End of inlet transition = start of trough | 299.853 | 301.403 |
| 3 | End of trough = start of outlet transition | 299.799 | 301.349 |
| 4 | End of outlet transition = normal canal | 299.855 | 301.405 |
Total loss of head = 301.550 − 301.405 = 0.145 m, so the canal bed downstream of the work is 0.145 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 299.20 m, i.e. 0.40 m above the drainage bed; HFL stands 1.30 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 297.70 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Answer: drainage waterway 96 m clear (12 × 8 m, overall 109.2 m); canal flumed to 18 m wide trough; bed/FSL at the four sections = 300.00/301.55, 299.85/301.40, 299.80/301.35, 299.86/301.41 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cross drainage: Q 50, HFD 450, uplift on roof · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 550 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 450 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: canal 300, drainage 500 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 25, HFD 360 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 30, HFL 311 m · Irrigation and Drainage Engineering, chapter 8
All Irrigation and Drainage Engineering chapter 8 questions →