- 2080 Chaitra · 4×2 marks
Sarda fall for Bagmati branch canal, Q 25
Short answer
Using Khosla's theory for exit gradient 1/5: trapezoidal crest at 101.05 m (top width 0.95 m, base 1.98 m); cistern 4.81 m long, 0.24 m deep; u/s cut-off 1.20 m, d/s 1.50 m; impervious floor length 15.5 m (u/s 6.3 m, d/s 7.2 m).
Eastern main canal of Bagmati Irrigation Project requires 1.2 m Sarda fall for a branch canal carrying a discharge of 25 m³/s with a flow depth of 1.8 m and channel bed width of 20 m. If a safe exit gradient for soil is 1/5, design following components: i) Dimension of crest (ii) Cistern (iii) Upstream and downstream cutoff (iv) Length of impervious floor.
Given data and assumptions
- m³/s, bed width m, side slope 1.5:1, u/s FSL m, u/s bed m, d/s bed m.
- Full supply depth u/s = d/s m (d/s FSL m); drop in water level m.
- Datum: u/s bed 100.00 m (assumed); d/s bed m and the depth is 1.8 m on both sides. Side slope 1.5:1 (not given, assumed).
Upstream flow conditions
(i) Crest
Since m³/s, a trapezoidal crest is used, with crest length equal to the bed width, m, and
where is the head over the crest (measured from the u/s FSL), is the top width of the crest and is the height of the crest above the d/s bed. Solving by trial:
Top width m. With a u/s batter of 1:3 and a d/s batter of 1:8, the base width m.
(ii) Cistern
Energy head over the crest m. Using the UPIRI formulas:
Cistern floor level m.
(iii) Upstream and downstream cut-offs
- U/s cut-off m.
- D/s cut-off m below the floor.
- Scour check: m²/s, Lacey's m (), so the d/s scour level m. The d/s cut-off reaches m, well below the scour level, so it is safe.
(iv) Length of impervious floor (Khosla, safe exit gradient )
Maximum seepage head (no flow, water up to the crest u/s, d/s dry): m.
Provide a total impervious floor of 15.5 m: d/s floor (from the toe of the crest) m, which contains the 4.81 m cistern; crest base 1.98 m; u/s floor m. Check: , safe.
Answer: (i) trapezoidal crest 20 m long at level 101.05 m (head 0.753 m), top width 0.95 m, base width 1.98 m; (ii) cistern 4.81 m long and 0.24 m deep (floor at 98.56 m); (iii) cut-offs 1.2 m (u/s) and 1.5 m (d/s); (iv) impervious floor 15.5 m (u/s 6.3 m, crest base 1.98 m, d/s 7.2 m).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Sarda fall: Q 12, bed level 103 m · Irrigation and Drainage Engineering, chapter 7
- Sarda fall: Q 12, U/S bed 103 m · Irrigation and Drainage Engineering, chapter 7
- Balancing depth: bed width 25 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Balancing depth: bed width 20 m · Irrigation and Drainage Engineering, chapter 3 · asked 3×
- Sarda fall: Q 12, FSL 501.40 · Irrigation and Drainage Engineering, chapter 7
- Sarda fall: Q 8, FSL 218.30 · Irrigation and Drainage Engineering, chapter 7
- Siphon from main canal to branch canal · Hydraulics, chapter 2 · asked 2×
- Contraction and bed rise, 3.5 m channel (1.2 m depth) · Hydraulics, chapter 7
- Contraction and bed rise, 3.5 m channel (1 m depth) · Hydraulics, chapter 7 · asked 2×
- Irrigation channel earthwork, bed 5 m, 1 in 3000 · Estimating and Costing, chapter 6
All Irrigation and Drainage Engineering chapter 7 questions →