Oxidation pond design, 250 m³/d; theory

Short answer

BOD load = 250 × 250/1000 = 62.5 kg/d; at 450 kg/ha/day, area = 0.139 ha (1389 m²). With 1.2 m depth, volume = 1667 m³, detention = 6.67 days, so adopt about 27 m × 53 m. Effluent BOD at 90% efficiency is 25 mg/l.

Design an oxidation pond to treat 250 m³/d of sewage from a community with permissible organic loading of 450 kg/ha/d. The influent BOD is 250 mg/l and the efficiency of the pond is maintained to be 90%. Describe the theory of oxidation pond.

Theory of oxidation pond

An oxidation pond is a shallow earthen pond in which sewage is treated by the combined action of bacteria and algae in sunlight.

  1. Aerobic bacteria in the upper layer oxidise organic matter: organics+O2→CO2+H2O+new cells+NH3+PO4\text{organics}+O_2\rightarrow CO_2+H_2O+\text{new cells}+NH_3+PO_4.
  2. Algae take the CO₂, ammonia and phosphates and, with sunlight, produce oxygen: CO2+H2O+light→algae+O2CO_2+H_2O+\text{light}\rightarrow\text{algae}+O_2; this oxygen is used by the bacteria (symbiosis), with additional aeration by the wind.
  3. Anaerobic bacteria at the bottom digest the settled sludge to CH₄, CO₂ and H₂S.
  4. Sunlight, high pH and long detention destroy pathogens.
  sunlight -> algae --O2--> bacteria
              <--CO2,NH3,PO4--
  ~~~~~~~ surface ~~~~~~~
  anaerobic sludge at bottom

Design

Assumption: operating depth d=1.2d=1.2 m; length : width =2:1=2:1.

BOD load=250×250/1000=62.5 kg/dayArea=62.5450=0.139 ha=1389 m2Volume=1389×1.2=1667 m3Detention time=1667250=6.67 daysW=1389/2=26.4 m,L=2W=52.7 mEffluent BOD=250×(1−0.9)=25 mg/l\begin{aligned} \text{BOD load} &= 250\times250/1000=62.5\ \text{kg/day}\\ \text{Area} &= \frac{62.5}{450}=0.139\ \text{ha}=1389\ \text{m}^2\\ \text{Volume} &= 1389\times1.2=1667\ \text{m}^3\\ \text{Detention time} &= \frac{1667}{250}=6.67\ \text{days}\\ W &= \sqrt{1389/2}=26.4\ \text{m},\quad L=2W=52.7\ \text{m}\\ \text{Effluent BOD} &= 250\times(1-0.9)=25\ \text{mg/l} \end{aligned}

Answer: pond area 13891389 m² (about 27 m x 53 m), depth 1.2 m (plus 0.5 m free board), detention 6.67 days, effluent BOD about 25 mg/l.