For 12,000 people at 100 lpcd and 250 mg/l BOD, Q=1200 m³/d, BOD load=300 kg/d. Using 300 kg/ha/day, area=1 ha, volume=11000 m³, detention=9.17 days. Adopt 71 m × 142 m at 1.1 m depth, total depth 1.6 m with free board, and provide a buffer zone around the embankment.
Calculate detention time and dimension of an oxidation pond for a town in Terai Region of Nepal with the following data. Draw neat sketch with necessary components showing buffer zone and detail dimensions as designed. Population = 12,000; Sewage flow = 100 lpcd; BOD of incoming sewage = 250 mg/l; Assume operational depth at 1.1 m.
Assumptions
Terai has a warm climate, so a surface organic loading of kg BOD/ha/day (usual range 200-400) is adopted. Length : width . Operational depth m (given). Free board 0.5 m, embankment slopes 1 : 2 (inside) and 1 : 1.5 (outside), crest width 3 m.
Step 1: Flow and load
Step 2: Area, volume and detention time
Step 3: Dimensions
Pond water surface (at mean depth) m². Total depth m. If possible, provide two ponds in parallel (each about half the area), so that one can be desludged.
Sketch (plan)
+--------------------------------------------+
| buffer zone (trees), 50 m (assumed) |
| +------------------------------------+ |
| | crest 3 m | |
| | +------------------------------+ | |
| | | POND 71 m x 142 m | | |
| | | inlet -> d = 1.1 m -> outlet| | |
| | +------------------------------+ | |
| +------------------------------------+ |
+--------------------------------------------+
Section: crest 3m, slope 1:2, FB 0.5 m, d 1.1 m
Answer: detention time days; pond area m² ( at mean depth), depth 1.1 m, with a buffer zone around the embankment.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Sedimentation tank and oxidation pond design · Sanitary Engineering, chapter 7
- Oxidation pond theory; 2500 persons · Sanitary Engineering, chapter 7
- Oxidation pond theory; colony of 15000 · Sanitary Engineering, chapter 7
- Oxidation pond design, 250 m³/d; theory · Sanitary Engineering, chapter 7
- Conventional ASP design, population 50,000 · Sanitary Engineering, chapter 7 · asked 2×
- Oxidation pond and area procedure · Sanitary Engineering, chapter 7
- Service reservoir capacity, 150,000 population · Water Supply Engineering, chapter 7
- Geology of the Terai zone · Engineering Geology I, chapter 7 · asked 2×
- Number and size of RSF, 1,20,000 population · Water Supply Engineering, chapter 6
- Siwalik zone in detail · Engineering Geology I, chapter 7 · asked 2×