Oxidation pond and area procedure
Short answer
Find sewage flow Q (population × per capita) and BOD load (kg/day = Q × BOD / 1000). Divide load by permissible surface loading (200–400 kg/ha/day) to get area; volume = area × depth, detention = V/Q. Example: 5000 people, 100 lpcd, 250 mg/l BOD, 300 kg/ha/day gives 0.42 ha (about 46 m × 91 m) and 10 days.
Briefly illustrate about oxidation pond. With suitable example, state its procedure to calculate its area.
Oxidation pond
An oxidation pond is a shallow (1-1.5 m) earthen pond in which sewage is stabilised by the symbiotic action of bacteria and algae in sunlight. Bacteria oxidise the organics using oxygen produced by algae; algae use the CO₂ and nutrients released by the bacteria. Settled solids are digested anaerobically at the bottom. It needs little energy and little skill but a large area, and removes 70-90% of BOD.
sunlight -> algae --O2--> bacteria
<--CO2,NH3,PO4--
~~~~~~~~~ water surface ~~~~~~~~~
anaerobic sludge layer at bottom
Procedure to calculate the area
- Find the sewage flow (m³/day) = population × per capita sewage.
- Find the BOD load: kg/day.
- Adopt a permissible surface organic loading (kg BOD/ha/day), 200-400 depending on temperature.
- Area (ha).
- Adopt depth (1-1.5 m); volume ; detention time (check 5-30 days).
- Fix the length-to-width ratio (2:1 to 3:1) and provide embankment, free board and inlet/outlet.
Example
Population = 5000, sewage 100 lpcd, BOD = 250 mg/l, loading 300 kg/ha/day, depth 1.2 m (assumed data).
For L : W = 2 : 1, m and m. Answer: area about 0.42 ha (about 46 m x 91 m), 10 days detention.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Oxidation pond for Terai town, 12,000 · Sanitary Engineering, chapter 7
- Oxidation pond theory; colony of 15000 · Sanitary Engineering, chapter 7
- Oxidation pond: theory and commissioning · Sanitary Engineering, chapter 7 · asked 3×
- Sedimentation tank and oxidation pond design · Sanitary Engineering, chapter 7
- Oxidation pond; flushing device role · Sanitary Engineering, chapter 7
- Oxidation pond theory; 2500 persons · Sanitary Engineering, chapter 7
- DAD curve procedure and isohyetal area data · Engineering Hydrology, chapter 2
- Principle and procedure of slope-area method · Engineering Hydrology, chapter 4
- Khosla: residual pressures and HGL, pond 260 m · Irrigation and Drainage Engineering, chapter 5
- Length of PQ across a pond · Surveying I, chapter 3