Sludge digestion tank, 6.5 MLD

Short answer

Dry solids removed are 893.8 kg/day; fresh sludge volume 17.52 m³/day and digested sludge 5.84 m³/day. Using parabolic digestion over 60 days gives capacity 584 m³; adopt a circular tank of diameter 11.5 m and side water depth 6 m.

Design a sludge digestion tank to treat sludge of primary sedimentation tank from the following data: a) Average flow of the sewage = 6.5 MLD; b) Total suspended solids in raw sewage = 250 mg/l; c) Water content of fresh sludge = 95%; d) Water content of digested sludge = 85%; e) Specific gravity of sludge = 1.02; f) Digestion period = 2 months; g) Primary settling tank removes 55% of suspended solids.

Data and assumptions

Flow Q=6500Q=6500 m³/day; suspended solids (SS) =250=250 mg/l; removal in the primary tank =55%=55\%; fresh sludge moisture =95%=95\%; digested sludge moisture =85%=85\%; specific gravity of sludge =1.02=1.02; digestion period =60=60 days (2 months). The digested sludge is taken to hold the same dry solids as the fresh sludge (solids loss in digestion is ignored, which is conservative); no extra storage period is added.

Step 1: Dry solids removed per day

Ws=Q×SS×removal=6500×250×0.55×10−3=893.8 kg/dayW_s=Q\times SS\times\text{removal}=6500\times250\times0.55\times10^{-3}=893.8\ \text{kg/day}

Step 2: Volume of fresh sludge

V1=Ws(1−0.95)×S×1000=893.80.05×1.02×1000=17.52 m3/dayV_1=\frac{W_s}{(1-0.95)\times S\times1000}=\frac{893.8}{0.05\times1.02\times1000}=17.52\ \text{m}^3/\text{day}

Step 3: Volume of digested sludge (volume-moisture relation)

V2=V1×100−95100−85=17.52×515=5.84 m3/dayV_2=V_1\times\frac{100-95}{100-85}=17.52\times\frac{5}{15}=5.84\ \text{m}^3/\text{day}

Step 4: Capacity of the digester (parabolic digestion)

V=[V1−23(V1−V2)]t=[17.52−23(17.52−5.84)]×60=584 m3V=\left[V_1-\frac{2}{3}(V_1-V_2)\right]t=\left[17.52-\frac{2}{3}(17.52-5.84)\right]\times60=584\ \text{m}^3

Step 5: Dimensions

Adopt a circular digester with a side water depth of 6 m (usual 6-12 m), plus 0.5 m free board and a hopper bottom with a 1 : 1 slope:

A=5846=97.3 m2,D=4Aπ=11.13 m (adopt 11.5 m)A=\frac{584}{6}=97.3\ \text{m}^2,\qquad D=\sqrt{\frac{4A}{\pi}}=11.13\ \text{m}\ (\text{adopt 11.5 m})

Answer: digester capacity ≈584\approx 584 m³, circular, diameter 11.5 m, side water depth 6 m (plus free board, hopper and gas dome).