Plain sedimentation tank for 4 MLD
Short answer
For 4 MLD, assuming 4 h detention and 3 m effective depth, volume is 666.7 m³ and plan area 222.2 m². With L:B=3:1, width is 8.7 m, length 26.0 m. SOR 17.7 m/day, horizontal velocity 0.106 m/min are acceptable. Dimensions: 26.0 m × 8.7 m × 3.0 m effective depth (4.0 m overall).
Design the plain sedimentation tank for treating 4 MLD of water. Assume necessary data suitably. Sketch designed sedimentation tank with dimensions.
Assumed data
Flow MLD m³/day. Assume detention period h (3 to 4 h for plain sedimentation), effective depth m, (usual 3:1 to 5:1).
Step 1: Volume and area
Step 2: Dimensions
Adopt m, m.
Step 3: Checks
All values are within the usual limits. Provide a free board of 0.5 m and a sludge zone of 0.5 m with the floor sloping 1 in 10 towards the sludge pit, so the overall depth is 4.0 m.
PLAN
+--------+--------------------------------+--------+
| inlet | L = 26.0 m | outlet | B = 8.7 m
| baffle | | weir |
+--------+--------------------------------+--------+
SECTION
inlet -> ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ FB 0.5 m
baffle | H = 3.0 m |-> outlet
|__________________________________|
\__ sludge zone 0.5 m (1:10) __/ -> drain
Answer: rectangular plain sedimentation tank 26.0 m 8.7 m 3.0 m effective depth (4.0 m overall).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Plain sedimentation tank for 3.75 L/s · Water Supply Engineering, chapter 6
- Rectangular sedimentation tank for 10 MLD · Water Supply Engineering, chapter 6
- Rectangular sedimentation tank, 8x10^6 L/day · Water Supply Engineering, chapter 6
- Rectangular sedimentation tank, 0.2 mm/s, 25000 population · Water Supply Engineering, chapter 6 · asked 2×
- Sedimentation tank 6 m x 18 m x 3 m, 4 ML/day · Water Supply Engineering, chapter 6
- Rectangular sedimentation tank for 3000 persons · Water Supply Engineering, chapter 6
- Circular sedimentation tank for 58 MLD · Sanitary Engineering, chapter 7
- Sludge volume from sedimentation tank, 10 MLD · Sanitary Engineering, chapter 8
- Sedimentation tank and oxidation pond design · Sanitary Engineering, chapter 7
- Sludge digestion tank, 6.5 MLD · Sanitary Engineering, chapter 8