Plain sedimentation tank for 3.75 L/s

Short answer

Flow is 324 m³/day. With 4 h detention and 2.1 m effective depth, required volume is 54 m³, plan area 25.7 m². For L:B=3:1, width is 3.0 m, length 9.0 m. SOR 12.0 m/day, velocity 0.036 m/min. Adopted effective size: 9.0 m × 3.0 m × 2.1 m (2.7 m overall).

Design a rectangular shape plain sedimentation tank to treat 3.75 l/s of water. Assume effective depth as 2.1 m and detention time as 4 hours.

Data and assumption

Q=3.75Q=3.75 l/s; effective depth H=2.1H=2.1 m; detention time t=4t=4 h. Assume L:B=3:1L:B=3:1.

Step 1: Flow and volume

Q=3.75×86 400=324 000 l/day=324 m3/dayQ=3.75\times86\,400=324\,000\ \text{l/day}=324\ \text{m}^3/\text{day} V=Qt=3.75×10−3×4×3600=54 m3V=Qt=3.75\times10^{-3}\times4\times3600=54\ \text{m}^3

Step 2: Plan area and dimensions

A=VH=542.1=25.71 m2,3B2=25.71⇒B=2.93 m, L=3B=8.78 mA=\frac{V}{H}=\frac{54}{2.1}=25.71\ \text{m}^2,\qquad 3B^2=25.71\Rightarrow B=2.93\ \text{m},\ L=3B=8.78\ \text{m}

Adopt B=3.0B=3.0 m, L=9.0L=9.0 m (A=27.0A=27.0 m²).

Step 3: Checks

t=27.0×2.1/324×24=4.20 h,SOR=32427.0=12.0 m3/m2/day,v=3243.0×2.1×1440=0.036 m/mint=27.0\times2.1/324\times24=4.20\ \text{h},\quad \text{SOR}=\frac{324}{27.0}=12.0\ \text{m}^3/\text{m}^2/\text{day},\quad v=\frac{324}{3.0\times2.1\times1440}=0.036\ \text{m/min}

The velocity is below 0.3 m/min (no scouring). The SOR is below the usual 15 to 30, which means a conservative design for such a small flow. Add 0.3 m free board and 0.3 m sludge zone: overall depth 2.7 m.

Answer: tank 9.0 m long ×\times 3.0 m wide ×\times 2.1 m effective depth (2.7 m overall).