- Asked 2/21
- 2070 Bhadra · 8 marks
Circular sedimentation tank, population 80000
Short answer
Two circular tanks, each 19.5 m diameter, 3.0 m side water depth (total 4.0 m), detention 2.0 h, surface loading 35.3 m³/m²/day.
What will be the circular sewage sedimentation tank dimension for an industrial area having population of 80,000? The average water demand is 135 lpcd. Assume that 78% water reaches at treatment plant and maximum demand is 2.5 times average demand. Dimension of the suspended silica particles available in influent water more than 0.12 mm.
Assumptions: sewage reaching the plant lpcd, designed for the maximum rate ( average): m³/day. Detention 2 h and depth 3 m are adopted; two tanks are provided. Silica mm () at 20°C.
Step 1: Design flow
Step 2: Capacity
Adopt detention period h and side water depth m (typical for plain sedimentation: 2-3 h, 2.5-4 m).
Step 3: Diameter
Provide 2 circular tanks, each with area (one tank can then be shut down for cleaning).
Adopt a total depth of m, with a central inlet well and a peripheral weir.
Step 4: Checks
Check: for mm, Hazen's transition formula at 20°C gives mm/s m/day ( in mm). This is far greater than the overflow rate of the tank, so silica of 0.12 mm and larger is removed.
Section (circular, radial flow)
inlet well weir/launder
-> |__|~~~~~~~~~~~~~~~~~~~~~|_
| \ / | H = 3.0 m
| \______ ______/ | + sludge zone
+----------\__/----------+
sludge hopper -> sludge pipe
<---------- D = 19.5 m ---------->
Answer: 2 circular sedimentation tanks, each of diameter 19.5 m, side water depth 3.0 m (total depth about 4.0 m), detention 2.0 h, surface loading 35.3 m³/m²/day.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Circular sedimentation tank, population 5500 · Sanitary Engineering, chapter 7 · asked 2×
- Circular sedimentation tank, population 35675 · Sanitary Engineering, chapter 7
- Minimum sewer diameter, 80000 population · Sanitary Engineering, chapter 3
- Circular sedimentation tank for 58 MLD · Sanitary Engineering, chapter 7
- Degree of treatment, domestic + industrial · Sanitary Engineering, chapter 6
- Septic tank and soak pits, hotel of 80 · Sanitary Engineering, chapter 9
- Conventional ASP design, population 50,000 · Sanitary Engineering, chapter 7 · asked 2×
- Rectangular sedimentation tank, 0.2 mm/s, 25000 population · Water Supply Engineering, chapter 6 · asked 2×
- Rectangular sedimentation tank, 9 million L peak demand · Water Supply Engineering, chapter 6
- Rectangular sedimentation tank, 20000 population, 0.4 mm/s · Water Supply Engineering, chapter 6
- Design pipes AB and BC, 75 lpcd, tank 6 m high · Water Supply Engineering, chapter 7