Determining total, volatile, settleable solids
Short answer
Total solids by evaporation/weighing; volatile and fixed solids by ignition at 550°C. Settleable solids: one litre settled in an Imhoff cone for one hour, read volume in mL/L. Non-settleable solids = suspended solids minus settleable solids.
How do you determine the Total Solid, Total Volatile Solid, Total Fixed Solid, Settleable Solid and Non-settleable Solids contained in a sewage sample?
All the solids are determined by weighing the residue after evaporation, filtration, settling or ignition.
Total solids (TS)
A well-mixed sample of 100 mL is poured into a clean, dried, pre-weighed evaporating dish (weight ). It is evaporated on a steam bath and dried in an oven at 103-105°C for 1 hour, cooled in a desiccator and weighed ().
Total fixed and volatile solids
The same dish with the residue is ignited in a muffle furnace at 550 ± 50°C for 15-20 min, cooled and weighed (). Organic matter burns away.
so .
Suspended and dissolved solids
A measured volume of sample is filtered through a weighed glass-fibre filter paper (Whatman GF/C). The filter with the residue is dried at 103-105°C and weighed. The weight gain gives the suspended solids (SS). Then dissolved solids = total solids − suspended solids.
Settleable solids
One litre of well-mixed sample is poured into an Imhoff cone and allowed to stand for 1 hour (after 45 minutes the sides of the cone are gently scraped or rotated to release the trapped matter). The volume of the solids settled at the bottom is read in mL/L. Settleable solids can also be found by weight:
Non-settleable solids
These are the solids which do not settle in 1 hour (colloids and very fine suspended matter):
(or equal to the suspended solids in the supernatant after settling; some books also include dissolved solids in this term.)
Sample
|
+-- evaporate 103 C ---> Total solids (TS)
| '-- ignite 550 C -> Volatile / Fixed
+-- filter ---> Suspended (SS) / Dissolved (DS)
'-- Imhoff cone 1 h --> Settleable / Non-settleable
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settleable solids; first-stage BOD · Sanitary Engineering, chapter 5
- Why examine wastewater; solids procedure · Sanitary Engineering, chapter 5
- BOD of Bagmati sample at 30°C · Sanitary Engineering, chapter 5
- Factors affecting sewage; calculating discharge · Sanitary Engineering, chapter 2
- Box plot; third quartile of suspended solids · Probability and Statistics, chapter 1
- Fixed shaft, two torques: couples, diameter · Strength of Materials, chapter 6
- Air: PV^3 expansion, cooling, heating; total work · Fundamental of Thermodynamics & Heat Transfer, chapter 2
- Torsion of non-circular bars by Saint-Venant · Mechanics of Solids, chapter 9