Requirements, coordination and protection zone

Short answer

Requirements: selectivity, speed, sensitivity, reliability, stability, simplicity, economy. Coordination means grading pick-up current and time of series devices so the nearest to the fault trips first, with a grading margin of 0.3–0.5 s. A protection zone is the region guarded, bounded by CTs and overlapped to prevent blind spots.

List down the basic requirements of good protective scheme. What do you understand by coordination of protective device and protection zone?

Basic requirements of a good protective scheme

  1. Selectivity – only the faulty section is isolated.
  2. Speed – minimum fault-clearing time to limit damage and keep stability.
  3. Sensitivity – operates on the smallest expected fault current.
  4. Reliability – operates correctly whenever needed and never falsely.
  5. Stability – no operation for external faults, load swings or inrush.
  6. Simplicity – fewer components, easy testing and maintenance.
  7. Economy – cost matched to the value of the protected equipment.

Coordination of protective devices

Coordination is the process of choosing the settings (pick-up current and time) of relays, fuses and breakers in series so that the device nearest to the fault operates first, and each upstream device acts only as time-delayed back-up.

  • Achieved by time grading, current grading or a combination (IDMT relays).
  • A grading margin (coordination time interval) of about 0.3–0.5 s is kept between successive relays, allowing for breaker opening time, relay overshoot and errors.

Example: On a radial feeder A→B→C with relays R1, R2, R3, relay R3 at the far end is set at 0.1 s, R2 at 0.5 s and R1 at 0.9 s for a fault at C. R3 clears the fault; R2 and R1 only reset.

Protection zone

A zone of protection is the region of the system (generator, transformer, bus, line, motor) guarded by a particular protection; its boundary is fixed by the CTs, and all breakers on that boundary trip for a fault inside it.

  • Every part of the system is covered by at least one zone.
  • Neighbouring zones overlap around a circuit breaker so there is no blind spot.
 ┌─Gen─┐┌─Transf─┐┌─Bus─┐┌──Line──┐┌─Bus─┐
 G ──[CB]─────[CB]────[CB]──────[CB]──── load
      overlaps at each CB