Seepage under embankment dam on pervious foundation

Short answer

Seepage through a pervious foundation causes water loss, uplift that reduces downstream stability, piping (boiling) when the exit gradient approaches critical, internal erosion and settlement. It is reduced by positive cut-offs, upstream blankets, relief wells and downstream filter berms, keeping the exit gradient below about one‑fourth of the critical gradient.

For an embankment dam on a pervious foundation, soil seepage underneath the dam poses a serious problem. Briefly discuss the consequences of this problem and how it is reduced.

When an embankment dam rests on a pervious foundation such as sand, gravel or fractured rock, a large part of the reservoir water flows under the dam. This is a serious problem for both safety and economy.

Consequences

  1. Loss of stored water and reduced power generation, especially when the flow is large.
  2. Uplift pressure under the d/s part of the dam reduces effective stress and the shear strength of the foundation, so the d/s slope and toe become unstable.
  3. Piping and boiling: if the exit gradient at the toe reaches the critical value ic=G−11+e≈1,i_c=\frac{G-1}{1+e}\approx 1, the soil is lifted (quick condition), and a pipe grows backwards beneath the dam, causing sudden failure.
  4. Internal erosion of fine particles, settlement of the dam and cracking of the embankment.
  5. Wet, swampy ground at the d/s side and damage to the toe.

How it is reduced

  • Positive cut-off: compacted clay trench, concrete diaphragm wall or secant piles reaching the impervious layer.
  • Partial cut-off: sheet piles or grout curtain when the pervious layer is deep.
  • Upstream impervious blanket of clay, which lengthens the seepage path and reduces gradient.
  • Relief wells and toe drain with filter to release uplift pressure safely.
  • Downstream loaded filter / berm to resist heaving.
  • Keep the exit gradient below the safe value, about 14\frac{1}{4} to 15\frac{1}{5} of ici_c for the design.