- Asked 2/22
- 2072 Chaitra · 6 marks
Combined plant heating feed water with exhaust
Short answer
Layout: gas turbine exhaust passes through a feed water heater before stack; condensate is pumped, heated by exhaust, then enters fired steam boiler; steam drives turbine and condenses. On T-S: gas cycle 1-2-3-4, exhaust 4-5 heats feed water d-e; steam cycle c-d pump, d-e heating, e-a boiler, a-b turbine, b-c condenser. Gain about 3-5% points, used for repowering.
Sketch the layout for a combined power plant in which waste heat of gas turbine outlet is used to heat feed water. Explain its working with processes on T-S diagram.
In this scheme a gas turbine is added to a conventional steam plant and its exhaust is used to heat the boiler feed water, replacing some or all regenerative (bled-steam) feed water heaters.
Layout
air fuel
| 1 |
v v
[C]--2-->[ CC ]--3-->[GT]==> G1
|| | 4 exhaust gas
++=====shaft=========+ v
+--------------------------+
stack <-5| Feed water heater (gas |
| to water heat exchanger) |
+--------------------------+
^ d | e hot feed water
| v
+------+ +----------+ a +----+
| Pump | | Steam |---->| ST |==> G2
+------+ | boiler | +----+
^ c +----------+ | b
| ^ fuel v
| +-----------------+
+-----------| Condenser |
+-----------------+
Working:
- Air is compressed (1-2), burnt with fuel in the combustion chamber (2-3) and expands in the gas turbine (3-4), driving the compressor and generator G1.
- The hot exhaust (about 450-550 C) passes through the feed water heater (an economiser-type gas-to-water heat exchanger) and leaves to the stack at 5.
- Condensate from the steam plant is pumped (c-d) and heated by the exhaust gas (d-e) nearly up to the boiling temperature. This replaces the bled-steam feed heaters, so steam that would have been extracted now expands fully in the turbine and produces extra power.
- The hot feed water enters the conventional fired steam boiler, where fuel supplies the latent heat and superheat (e-a).
- Steam expands in the steam turbine (a-b) driving G2, is condensed (b-c) and the cycle repeats.
The steam boiler is still fully fired, so this scheme gives a modest gain (about 3-5% points) and is often used to repower an existing steam plant by adding a gas turbine.
T-s diagram
T
^ 3
| /|
| / | gas cycle 1-2-3-4,
| 2 | exhaust 4-5 heats
| | 4 feed water d-e
| | /
| |5
| 1 a
| f---------g /|
| e |
| / |
| d |
| c---------------b
+---------------------------> s
c-d pump, d-e heating by GT exhaust,
e-f-g-a heating in fired boiler,
a-b steam turbine, b-c condenser
(gas and steam drawn per kg of
their own fluid, schematic only)
The heat given by the gas, , equals the heat taken by the water, .
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Waste heat methods and feed water heating layout · Power Plant Equipment, chapter 8 · asked 2×
- Feed water heating combined circuit and reasons · Power Plant Equipment, chapter 8
- Working of combined gas-steam plant · Power Plant Equipment, chapter 8
- Combined cycle components and waste heat use · Power Plant Equipment, chapter 8
- Methods to utilize waste heat in combined plants · Power Plant Equipment, chapter 8 · asked 2×
- Regenerative scheme with open feed water heater · Power Plant Equipment, chapter 7
- Reheat gas turbine power plant · Power Plant Equipment, chapter 6
- Combined cycle gas turbine versus hydro · Power Plant Design, chapter 1