Flexible pavement failures; deflection overlay design

Short answer

Common flexible pavement failures include alligator cracking, rutting, shoving, potholes, ravelling, bleeding, depression, edge failure, longitudinal/reflection cracks, and stripping. The deflection approach measures elastic rebound deflection with a Benkelman beam under a standard 8170 kg axle load, corrects for temperature (to 35°C) and season, then calculates the overlay thickness needed to carry future traffic.

What are the most common failures of flexible pavement? Describe the deflection approach for the design of overlay for flexible pavement.

Common failures of flexible pavement

A flexible pavement fails when it can no longer give a safe, smooth ride or carry the traffic. Common failures:

FailureDescriptionMain causesRemedy
Alligator (fatigue) crackingInterconnected cracks like crocodile skin in the wheel pathsRepeated loading, thin layers, weak subgrade or base, poor drainage, aged binderPatching or removal and replacement, overlay, drainage improvement
RuttingLongitudinal depressions in the wheel pathsWeak subgrade/base, insufficient compaction, overloading, soft mix in hot weatherFill with a levelling course, overlay, reconstruct if deep
Shoving and corrugationBulges and waves across the roadUnstable mix, poor bond, braking and starting loadsRemove and replace, scarify and relay
PotholesBowl-shaped holesWater entering through cracks, weak mix, traffic wearPatching with premix
RavellingLoss of stone from the surfacePoor bitumen, stripping, ageing, insufficient binderSeal coat, surface dressing
BleedingExcess bitumen forms a shiny filmToo much binder, low air voids, heatSpread hot sand/chips, remove excess binder
Depression and settlementLocal sinkingSubgrade consolidation, poor compaction, utility trenchFill and level, reconstruct base
Edge failureBreaking at the pavement edgePoor support, narrow shoulder, waterStrengthen shoulder, improve drainage
Longitudinal / reflection cracksCracks that follow joints or cracks in the layer belowDifferential settlement, poor construction joints, old cracksSeal, overlay with a crack relief layer
StrippingLoss of bond between bitumen and aggregateWater action, hydrophilic aggregateAnti-stripping agent, replacement

Deflection approach for overlay design

The deflection approach estimates the overlay needed to raise the structural capacity of an existing pavement to that required for future traffic. It is based on the elastic rebound deflection measured under a standard wheel load (Benkelman beam as per IRC:81-1997, or FWD). Steps of the Benkelman beam method:

  1. Select the section and test points: divide the road into homogeneous sections and choose at least 10 test points in each, at about 50 m spacing, staggered between the lanes. The points lie in the outer wheel path, 0.9 m from the pavement edge (0.6 m for lanes narrower than 3.5 m).
  2. Standard test vehicle: a truck with a rear axle load of 8170 kg (dual wheels, 4085 kg on each dual-wheel set) and a tyre pressure of 5.6 kg/cm².
  3. Measurement: place the beam probe between the dual wheels at the test point and note the initial dial reading d0d_0. Move the truck slowly forward 2.7 m (intermediate reading did_i) and then to 9 m (final reading dfd_f). Record the pavement temperature.
  4. Rebound deflection: D=2 (d0−df)×D=2\,(d_0-d_f)\times least count, where the factor 2 is the beam lever ratio. If di−dfd_i-d_f exceeds 0.025 mm, the front legs of the beam were inside the deflection bowl, and a leg correction is applied: D=2(d0−df)+2K(di−df)D=2(d_0-d_f)+2K(d_i-d_f) with K=2.91K=2.91.
  5. Corrections:
    • Temperature: the standard temperature is 35 °C. Correct by 0.01 mm for each °C difference from 35 °C (add when the pavement is colder, subtract when it is hotter). This applies when the bituminous layers are 40 mm or thicker.
    • Season: multiply by a seasonal correction factor (from the IRC:81 charts, based on subgrade soil type, plasticity index, field moisture content and annual rainfall) to convert the deflection to the weakest, post-monsoon condition.
  6. Characteristic deflection: Dc=Dˉ+2σD_c=\bar D+2\sigma for national and state highways (Dc=Dˉ+σD_c=\bar D+\sigma for other roads), where Dˉ\bar D is the mean and σ\sigma the standard deviation of the corrected deflections.
  7. Design traffic in msa over the overlay design life (usually 10 years), from the present commercial vehicles per day, growth rate and VDF.
  8. Overlay thickness: read from the IRC:81 chart of characteristic deflection against design traffic (msa), which gives the thickness in mm of bituminous macadam (BM). It can also be estimated by the approximate formula h=550log⁡10(Dc/Da)h=550\log_{10}(D_c/D_a) (h in mm), where DaD_a is the allowable deflection for the design traffic.
  9. Convert to the actual overlay material using the IRC:81 equivalence (1 cm of BM = 1.5 cm of WBM/WMM = 0.7 cm of DBM/BC). Repair badly cracked areas before overlaying, and provide the profile-correction (levelling) course and wearing course in addition.