- 2079 Bhadra · 8 marks
Flexible pavement design with 8 CBR values
Short answer
Design CBR from 90th percentile conservatively taken as 4%. Weighted VDF = 1.95; design traffic after 2.5 years to opening and 10-year life with 7% growth and 75% lane factor: Ns = 2.97 msa. Section adopted from 10-msa catalogue: 40 mm BC, 80 mm DBM, 250 mm WMM base, 330 mm GSB (total 700 mm).
Design a flexible pavement for a two lane highway using provided tables and catalogues. Subgrade CBR values obtained from tests conducted at eight locations are: 11%, 7%, 6%, 7%, 4%, 4%, 8%, and 5%. Total both directional traffic as per last count is 340 CV/day with 60% vehicles of 10000 kg axle load and 40% vehicles of 9000 axle load. Use design life of 10 years, expected completion period of 2.5 years from the date of last count and a traffic growth rate of 7%. State your assumption for estimating the design traffic.
Design method and assumptions
IRC:37-2012 (also followed by Nepal DoR for road pavements) is used.
- Two-lane single carriageway: design lane carries 50 percent of the two-way commercial traffic as per IRC:37-2012; a more conservative 75 percent (IRC:37-2001) is used here to cover heavier lane loading on a two-lane road.
- Each commercial vehicle is taken to impose its quoted load on one critical axle (10 000 kg and 9000 kg) and the damage of that axle is counted; standard axle = 80 kN (8160 kg); m/s2.
- Traffic is counted now; the road opens after 2.5 years; design life years; .
Step 1 - Design CBR
| CBR (%) | No. equal or greater | Percent equal or greater |
|---|---|---|
| 4 | 8 | 100.0 |
| 5 | 6 | 75.0 |
| 6 | 5 | 62.5 |
| 7 | 4 | 50.0 |
| 8 | 2 | 25.0 |
| 11 | 1 | 12.5 |
The CBR value at which 90 percent of results are equal or greater lies between 4 % (100 percent) and 5 % (75 percent), about 4.4 %. The design subgrade CBR is taken as 4 % (conservative; on the safe side).
Step 2 - Vehicle damage factor (fourth power law)
- 10 000 kg axle:
- 9000 kg axle:
- Weighted:
Step 3 - Design traffic
Traffic at opening: CVPD.
Step 4 - Pavement composition
The lowest design traffic in the IRC:37-2012 catalogues is 10 msa, so for the subgrade CBR of 4 % the 10 msa section is adopted (it is safe for 3 msa; a thinner section can be designed using the IRC:37-2001 plates or IRC:SP:72 if economy is required).
| Layer | Thickness (mm) |
|---|---|
| Bituminous concrete (BC) | 40 |
| Dense bituminous macadam (DBM) | 80 |
| Wet mix macadam (WMM) base | 250 |
| Granular sub-base (GSB) | 330 |
| Total | 700 |
Answer: design traffic msa; section = 40 mm BC + 80 mm DBM + 250 mm WMM + 330 mm GSB over subgrade of CBR 4 %.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- VDF; four-lane flexible design from catalogue · Transportation Engineering II, chapter 2
- Flexible pavement design: four lane, ADT 8000 trucks · Transportation Engineering II, chapter 2
- Flexible pavement life with 140 cvpd traffic · Transportation Engineering II, chapter 2
- Flexible design: four-lane, AADT 12,000 · Transportation Engineering II, chapter 2
- IRC pavement design: 5640 CVPD, CBR 6% · Transportation Engineering II, chapter 2
- IRC CBR-method design: 1200 CVPD, 4% subgrade · Transportation Engineering II, chapter 2
- CBR test on subgrade soil · Transportation Engineering I, chapter 6
- Setback on six lane highway, 550 m radius · Transportation Engineering I, chapter 3
- Per unit values: 100 MVA generator, two motors · Power System Analysis I, chapter 3