- 2072 Chaitra · 8 marks
DSM concept; planning and implementation steps
Short answer
DSM changes the amount and timing of customer electricity use to achieve a desired load shape, using peak clipping, valley filling, load shifting, conservation, growth, and flexible load. Planning steps are set objectives, load research, identify alternatives, evaluate, select and design, implement, then monitor and feed results back.
Explain the concept of demand side management. Discuss the steps involved in DSM planning and implementation.
Demand side management (DSM) is the set of utility activities designed to influence the amount and timing of customers' electricity use so that the utility's load shape changes in a desired way. Instead of building more supply to meet demand (supply side), DSM manages the demand itself.
Concept: load shape objectives
Utility load curve (kW vs time of day)
peak
kW /\ clip the peak
| __/ \__ fill the valley
|__/ \__ shift peak -> night
| valley
+------------------ time
- Peak clipping: reduce load at peak hours (direct load control).
- Valley filling: build load in off-peak hours (night pumping, EV charging).
- Load shifting: move load from peak to off-peak (TOD tariff, storage heaters).
- Strategic conservation: reduce energy use overall (efficient lamps, motors).
- Strategic load growth: increase sales in a planned way (electric cooking).
- Flexible load shape: interruptible loads that can be curtailed when needed, for a lower tariff.
Steps in DSM planning and implementation
- Set objectives: define the utility's goals (reduce peak, defer new plant, cut losses, improve load factor).
- Load research and data collection: study the load curve, consumer categories and end uses; identify where and when demand is high.
- Identify DSM alternatives: list possible technologies and programmes (efficient lighting, pf correction, TOD tariff, load control, solar water heaters).
- Evaluate alternatives: cost–benefit analysis from the view of utility, participant and society (tests such as total resource cost, ratepayer impact); estimate MW and MWh savings.
- Select programmes that are cost-effective and acceptable to customers.
- Design the programme: target customers, incentives, tariffs, delivery mechanism, marketing.
- Implementation: pilot programme, customer awareness, training, procurement and installation.
- Monitoring and evaluation: measure actual savings and load shape change; give feedback to improve the programme.
DSM planning is continuous; results of monitoring feed back into the next planning cycle and into the utility's integrated resource plan.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Load management in DSM; steps to implement DSM · Utilization of Electrical Energy, chapter 6
- DSM techniques for controlling peak demand · Utilization of Electrical Energy, chapter 6
- Load management, tariff in DSM, tariffs in Nepal · Utilization of Electrical Energy, chapter 6
- DSM definition, significance and techniques · Utilization of Electrical Energy, chapter 6 · asked 2×
- What DSM is; effective DSM techniques · Utilization of Electrical Energy, chapter 6 · asked 4×
- Importance of DSM in Nepalese power system · Utilization of Electrical Energy, chapter 6
- Client planning in implementation stage · Construction Management, chapter 2
- Time cost trade-off and steps in planning · Construction Management, chapter 2
- Importance and steps of planning and scheduling · Construction Management, chapter 2
- Design steps of side drain · Transportation Engineering I, chapter 4