- 2073 Chaitra · 4 marks
Train services for trapezoidal and quadrilateral curves
Short answer
A trapezoidal speed-time curve (acceleration, free run, braking) represents main-line long-distance service with long constant-speed runs. A quadrilateral curve (acceleration, coasting, braking) corresponds to urban and suburban services where stops are frequent and coasting replaces sustained free running.
What types of train service correspond to trapezoidal and quadrilateral speed time curves?
A trapezoidal speed-time curve (acceleration, free run, braking) represents main-line (long-distance) service, while a quadrilateral curve (acceleration, coasting, braking) represents urban and suburban service.
Trapezoidal curve: main-line service
- Stations are far apart (often more than 10 km), so the train runs most of the time at constant (crest) speed.
- The acceleration and braking periods are short compared with the free-run period.
- So the actual curve is closely approximated by three straight lines: constant acceleration, constant speed and constant retardation. Together with the time axis these form a trapezium.
- It is used for main-line and long-distance express trains.
Quadrilateral curve: urban and suburban service
- Stops are close together (about 1 km for urban and 1–8 km for suburban), so the train never runs long at constant speed.
- After the initial constant acceleration, the speed rises slowly along the motor curve; then power is switched off, the train coasts, and finally it brakes.
- In the simplified curve, the speed-curve running is merged into the acceleration line, so there are three straight lines: acceleration, coasting and braking. Together with the time axis these form a quadrilateral.
- Used for city and suburban trains, metro and tram services, where high acceleration and braking matter more than top speed.
Speed Speed
| ________ | /\
| / \ | / ``--._
| / \ | / \
|/ \ | / \
+--------------\-- t +/-------------\-- t
Trapezoidal (main line) Quadrilateral (urban)
| Curve | Service | Main feature |
|---|---|---|
| Trapezoidal | Main line | Long free run at crest speed |
| Quadrilateral | Urban / suburban | Coasting, no long free run |
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Speed-time curves for services; notching, coasting etc. · Utilization of Electrical Energy, chapter 4
- Quadrilateral speed-time curve on down gradient · Utilization of Electrical Energy, chapter 4
- Speed-time curves: urban, sub-urban, main line · Utilization of Electrical Energy, chapter 4
- Schedule speed for a 2 km run (trapezoidal) · Utilization of Electrical Energy, chapter 4 · asked 3×
- Schedule speed for a 1.5 km run (trapezoidal) · Utilization of Electrical Energy, chapter 4 · asked 3×
- Schedule speed for a 2.5 km run (trapezoidal) · Utilization of Electrical Energy, chapter 4 · asked 3×
- Compound gear train speed numerical · Theory of Mechanism and Machine I, chapter 6
- Time and space mean speed from 14 travel times · Transportation Engineering II, chapter 1
- Time and space mean speed from 20 spot speeds · Transportation Engineering II, chapter 1
- Time/space mean speed and density from spot speeds · Transportation Engineering II, chapter 1