Need for EHV and UHV lines
Short answer
Power transfer capability rises with voltage squared and losses reduce inversely, so one UHV line can replace many lower-voltage lines. This reduces right-of-way, cost per MW and overcomes stability limits for bulk long-distance transmission.
"EHV and UHV lines are necessary to transmit large blocks of power over long distances". Justify the statement.
EHV (about 300–765 kV) and UHV (1000 kV AC and above, ±800 kV DC) lines are needed because the power a line can carry rises with the square of voltage, while losses and the cost per MW fall as voltage rises.
Justification
- Power capacity rises as :
The natural (surge impedance) loading is . Taking :
| Line voltage | SIL () |
|---|---|
| 220 kV | 121 MW |
| 400 kV | 400 MW |
| 765 kV | 1463 MW |
So one 765 kV line carries as much as about twelve 220 kV lines.
- Lower losses: for power the current is , so the loss . Doubling the voltage cuts losses to a quarter.
- Less right-of-way per MW: fewer lines are needed, which saves land, forest and resettlement cost, very important in hilly areas like Nepal.
- Lower cost per MW-km: although towers and insulation cost more, the cost per unit of power carried is lower.
- Better stability over long distance: a higher voltage gives a larger power margin for the same angle and, with bundled conductors, lower reactance.
- Remote large generation: big hydro, coal or renewable plants are far from load centres (e.g. Himalayan hydro to Indian plains, Chinese west-to-east transfer), needing bulk transfer over hundreds of km.
- Interconnection of grids and power trading need strong high-capacity links.
Costs to accept
Corona loss, radio and audible noise, switching overvoltage, larger clearances and insulation, and high field effects must be controlled using bundled conductors, closing resistors, arresters and proper design. Even with these, EHV/UHV is the economical way to move large blocks of power over long distances.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- How corona occurs in EHV lines · High Voltage Engineering, chapter 5
- Issues of EHV-AC power transmission · High Voltage Engineering, chapter 1
- New EHV trends and adoption in Nepal · High Voltage Engineering, chapter 1
- HVDC for long distance and B2B significance · High Voltage Engineering, chapter 1
- Justify: trending method for large area forecast · Transmission and Distribution System Design, chapter 6
- T/F: series compensation in EHV lines · Transmission and Distribution System Design, chapter 2
- Problem statement and UML building blocks · Object Oriented Analysis and Design, chapter 2
- Justify higher voltage/more circuits for more power · Transmission and Distribution System Design, chapter 2