Thermal is firm, synchronous, 30–40% efficient, moderately flexible, but polluting with high fuel cost. Geothermal is steady base load with 80–90% capacity factor and only 10–20% efficiency, site-limited with corrosion issues. PV is intermittent, inverter-based, 15–20% capacity factor, low cost, simple maintenance, and clean.

Compare the operational characteristics of thermal, geothermal and PV plant on the basis of reliability, grid connection, efficiency, operating range and maintainability.

Thermal power plants burn fossil fuel to raise steam; geothermal plants take steam or hot water from the earth's heat; PV plants convert sunlight directly into DC electricity using semiconductor cells.

Working in brief

Thermal:  Fuel -> Boiler -> Steam -> Turbine -> Gen
Geotherm: Well -> Separator/HX -> Turbine -> Gen
                  (brine reinjected)
PV:       Sun -> PV array -> Inverter -> Grid

Comparison

BasisThermalGeothermalSolar PV
ReliabilityFirm and dispatchable if fuel is available; availability about 70–85%Very steady; capacity factor about 80–90%; resource declines if brine is not reinjectedOnly in sunshine; capacity factor about 15–20%; needs storage/backup
Grid connectionLarge synchronous units near load; provide inertia and reactive powerSynchronous units of 5–100 MW at remote geothermal fields; long lines may be neededInverter based; no inertia; harmonics, voltage rise and reverse flow; can connect at distribution level
EfficiencyAbout 30–40%About 10–20%About 15–22% (module), system lower
Operating rangeMinimum stable load about 40–50%; slow start (hours); moderate rampBase load; little load-following abilityOutput from zero to peak by irradiance; MPPT; not dispatchable
MaintainabilityComplex; boiler, coal and ash handling, cooling system; many skilled staffCorrosion and scaling by dissolved minerals; well workoversVery low; module cleaning, inverter replacement every 10–15 years; no moving parts
Fuel costHighNilNil
Capital costModerateHigh (exploration and drilling risk)Low and falling
Construction time3–4 years3–6 yearsMonths
LocationFlexibleOnly at geothermal fieldsWherever there is sunshine and land/roof
EnvironmentCO₂, SO₂, NOx, ashLow; H₂S, minerals, land subsidenceClean in operation; land use and panel disposal
Life25–30 years30–50 yearsAbout 25 years

Remarks

  • Thermal: most flexible in location and output, but high fuel cost and pollution.
  • Geothermal: ideal clean, firm base load where the resource exists; but inflexible (little load following) and site-limited.
  • PV: cheapest and simplest to build and maintain, but intermittent; best combined with hydro or storage.

For Nepal, thermal is limited to diesel standby, geothermal is only at low-temperature hot springs (direct use), and PV is growing as a complement to run-of-river hydro.