- Asked 3/16
- 2074 Bhadra · 5 marks
Change order: x/(x²+y²)
Short answer
Reverse the order to x from 0 to a, y from 0 to x. The integral becomes ∫₀ᵃ ∫₀ˣ x dy dx/(x²+y²) = ∫₀ᵃ (π/4) dx = πa/4.
Evaluate ∫₀ᵃ ∫_y^a x dx dy/(x²+y²) by changing order of integration. [Limits as printed: outer 0 to a, inner y to a; scan unclear]
How I read the limits. As printed: I = ∫₀^a ∫_y^a x dx dy/(x² + y²), with y the outer variable (0 to a) and x the inner variable (from y to a).
Region
0 ≤ y ≤ a and y ≤ x ≤ a. This is the triangle with vertices (0,0), (a,0), (a,a), lying between y = 0, y = x and x = a.
y
a | *(a,a)
| / |
| / |
| /_____|__ x
0 a
Reversing the order: x runs from 0 to a, and for each x, y runs from 0 to x.
Reversed integral
I = ∫₀^a x [ ∫₀^x dy/(x² + y²) ] dx
Inner: ∫₀^x dy/(x² + y²) = (1/x) tan⁻¹(y/x) |₀^x = (1/x)(π/4).
I = ∫₀^a x · (π/4x) dx = (π/4) ∫₀^a dx = π a/4
Answer: π a/4.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Change order: y²/√(y⁴−a²x²) · Mathematics, chapter 2 · asked 3×
- Change order of integration: cos y/√((a−x)(a−y)) · Mathematics, chapter 2
- Evaluate ∫∫ e^(y/x) dy dx · Mathematics, chapter 2
- Evaluate ∫∫ e^(x²) dx dy · Mathematics, chapter 2
- Polar coordinates: ∫∫(x²+y²) dy dx · Mathematics, chapter 2 · asked 5×
- VBT for [Fe(CN)₆]³⁻ inner/outer orbital · Engineering Chemistry, chapter 6
- Inner/outer orbital complexes; VBT of [Fe(CN)₆]³⁻ · Engineering Chemistry, chapter 6
- Actual grade on inner and outer lanes · Transportation Engineering I, chapter 3
- RK-4: dy/dx = (1+x²)y · Numerical Method, chapter 6