- 2068 Bhadra · 5 marks
Change order of integration: cos y/√((a−x)(a−y))
Short answer
Changing the order: y from 0 to a, x from y to a. The inner integral becomes 2√(a-y), cancelling the square root, leaving 2∫₀ᵃ cos y dy = 2 sin a.
Change the order of integration and hence evaluate the same: ∫₀ᵃ ∫₀ˣ cos y dy dx/√((a−x)(a−y)).
I = ∫₀^a ∫₀^x cos y dy dx / √((a − x)(a − y))
Region
For the given order, y runs from 0 to x and x from 0 to a: the triangle 0 ≤ y ≤ x ≤ a (vertices (0,0), (a,0), (a,a)).
y
a | *(a,a)
| /|
| / |
| /____|__ x
0 a
Changing the order: y from 0 to a, and for each y, x from y to a.
Reversed integral
I = ∫₀^a [ cos y / √(a − y) ] [ ∫_y^a dx / √(a − x) ] dy
Inner integral: ∫_y^a (a − x)^(−1/2) dx = [ −2√(a − x) ]_y^a = 2√(a − y).
I = ∫₀^a [ cos y / √(a − y) ] · 2√(a − y) dy
= 2 ∫₀^a cos y dy
= 2 sin a
Changing the order removes the awkward square roots, which is why it helps.
Answer: I = 2 sin a.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Evaluate ∫∫ e^(y/x) dy dx · Mathematics, chapter 2
- Evaluate ∫∫ e^(x²) dx dy · Mathematics, chapter 2
- Change order: y²/√(y⁴−a²x²) · Mathematics, chapter 2 · asked 3×
- Change order: x/(x²+y²) · Mathematics, chapter 2 · asked 3×
- Polar coordinates: ∫∫(x²+y²) dy dx · Mathematics, chapter 2 · asked 5×
- Solve sin x dy/dx + y cos x = x sin x · Mathematics I, chapter 4
- RK-4: dy/dx = (1+x²)y · Numerical Method, chapter 6
- Solve (1+y²)+(x−e^(tan⁻¹y))dy/dx=0 · Mathematics I, chapter 4 · asked 6×
- Solve dy/dx = y/x + tan(y/x) · Mathematics I, chapter 4 · asked 6×