Spindle speed N=1000×25/(π×20)=398 rpm; approach A=(20/2) cot(59°)=6.01 mm; feed rate=0.25×398=99.5 mm/min; total travel 58.01 mm gives time 0.583 min (≈35 s); MRR=(π/4)×20²×99.5=31.25 cm³/min.

A 20 mm diameter hole is to be drilled through a 50 mm thick mild steel plate with a twist drill of 118° point angle at a cutting speed of 25 m/min and feed of 0.25 mm/rev. Allow 2 mm for breakout (overtravel). Find (a) spindle speed, (b) drill approach, (c) feed rate, (d) time to drill the hole and (e) metal removal rate.

Given: D = 20 mm, t = 50 mm, v = 25 m/min, f = 0.25 mm/rev, point angle 118°, overtravel = 2 mm.

(a) Spindle speed

N=1000 vπD=1000×25π×20=397.9 rpmN = \frac{1000\,v}{\pi D} = \frac{1000 \times 25}{\pi \times 20} = 397.9\ \text{rpm}

(b) Drill approach (point allowance)

The drill must travel until its full diameter enters the plate.

A=D2cot⁡(118∘2)=202×tan⁡59∘=101.664=6.01 mmA = \frac{D}{2}\cot\left(\frac{118^\circ}{2}\right) = \frac{20}{2 \times \tan 59^\circ} = \frac{10}{1.664} = 6.01\ \text{mm}

(c) Feed rate

fm=f×N=0.25×397.9=99.5 mm/minf_m = f \times N = 0.25 \times 397.9 = 99.5\ \text{mm/min}

(d) Time

Total tool travel:

L=t+A+overtravel=50+6.01+2=58.01 mmL = t + A + \text{overtravel} = 50 + 6.01 + 2 = 58.01\ \text{mm} T=Lfm=58.0199.5=0.583 min≈35 sT = \frac{L}{f_m} = \frac{58.01}{99.5} = 0.583\ \text{min} \approx 35\ \text{s}

(e) Metal removal rate

MRR=π4D2×fm=π4(20)2×99.5=31,250 mm3/min\text{MRR} = \frac{\pi}{4}D^2 \times f_m = \frac{\pi}{4}(20)^2 \times 99.5 = 31{,}250\ \text{mm}^3/\text{min}
QuantityValue
N397.9 rpm
Approach6.01 mm
Feed rate99.5 mm/min
Time0.583 min
MRR31.25 cm³/min

Answer: N = 398 rpm, approach = 6.01 mm, feed rate = 99.5 mm/min, time = 0.583 min (35 s), MRR = 31.25 cm³/min.