- Asked 4/27
- 2080 Baisakh · 12 marks
Lag compensator for k/[s(s+2)(s+20)], Kv = 20
Short answer
Set k=800 to meet Kv=20 sec^-1. The lag network Gc(s)=(1+5.92s)/(1+53.4s) with zero at -0.169 rad/s and pole at -0.0187 rad/s (β=9.02) shifts the gain crossover to 1.69 rad/s, yielding a phase margin of 39.9°≥35° while maintaining Kv=20 sec^-1.
Design a suitable lag compensating network for G(s) = k/[s(s+2)(s+20)] to meet the following specification: Kv = 20 sec⁻¹, P.M ≥ 35°.
A lag network () is designed by the Bode plot method.
Step 1: Gain for
Step 2: Uncompensated margins
- at rad/s; , so .
- rad/s, dB.
The system is on the verge of instability.
Step 3: New gain crossover frequency
Allow for the lag of the network:
Step 4: Value of
Step 5: Corner frequencies
Step 6: Compensator and check
| Quantity | Uncompensated | Compensated |
|---|---|---|
| Gain crossover | 6.03 rad/s | 1.69 rad/s |
| Phase margin | 1.6° | 39.9° |
| Gain margin | 0.8 dB | 19.2 dB |
| 20 s | 20 s |
(With only allowance the PM comes out at , just on the limit; the allowance gives a safe margin.)
Answer: , (zero at , pole at ); , .
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Lag compensator for k/[s(1+0.1s)(1+0.2s)], Kv = 30 · Control Systems, chapter 7 · asked 4×
- Lead compensator for 4/[s(s+2)], Kv=20, PM≥50° · Control Systems, chapter 7 · asked 2×
- Lag compensator for 1/[s(s+1)(0.5s+1)], Kv = 5 · Control Systems, chapter 7
- Lead compensator for K/[s(1+0.2s)], Kv≥20, PM≥44° · Control Systems, chapter 7 · asked 2×
- Lag compensator for 2/[s(s+1)(s+2)], Kv = 5, PM 40° · Control Systems, chapter 7 · asked 2×
- Lead vs lag; lead design for K/[s²(1+0.25s)] · Control Systems, chapter 7 · asked 3×
- Lag compensator for K/[s(s+4)(s+80)], Kv = 30 · Control Systems, chapter 7
- Lag compensator for 0.53/[s(1+s)(1+0.5s)], Kv = 5 · Control Systems, chapter 7
- Short note: Phase-lead/phase-lag compensator · Digital Control System, chapter 4
- Design: 250 m head plant, 35 km line · Power Plant Design, chapter 4 · asked 12×
- AVL tree for 10, 20, 30, 35, 50, ... · Data Structure and Algorithm, chapter 6
- Mixing three gravel quarries to specification · Transportation Engineering I, chapter 6