Acceptance sampling inspects a random sample to decide lot acceptance. Single plan: sample n, accept if defectives ≤ c. Double plan uses two stages for less inspection. For the shaft: Cp = (25.06-24.94)/(6*0.018) = 1.11, Cpk = min((25.06-25.01)/(3*0.018), (25.01-24.94)/(3*0.018)) = 0.926. Outside ≈ 0.28%; off-centre mean lowers Cpk.

(a) Write short notes on acceptance sampling (single and double sampling plans). (b) A shaft diameter is specified as 25.00±0.0625.00 \pm 0.06 mm. The process is in control with mean 25.01 mm and standard deviation 0.018 mm. Calculate CpC_p and CpkC_{pk}, the percentage of shafts outside the limits (assume normal distribution), and comment.

(a) Acceptance sampling

In acceptance sampling a random sample is drawn from a lot and inspected; the lot is accepted or rejected from the result. It is used when 100 % inspection is too costly, too slow or destructive.

  • Single sampling plan: sample size nn and acceptance number cc. If the number of defectives found is ≤c\le c, the lot is accepted; otherwise it is rejected. Simple and easy to administer.
  • Double sampling plan: a first small sample n1n_1 is taken. If defectives ≤c1\le c_1 accept; if ≥c2\ge c_2 reject; if in between, take a second sample n2n_2 and decide on the combined count. It needs on average less inspection and gives a second chance to good lots.

The OC (operating characteristic) curve shows the probability of accepting a lot against its fraction defective. Producer's risk α\alpha (rejecting a good lot at AQL) and consumer's risk β\beta (accepting a bad lot at LTPD) are fixed by choice of nn and cc.

(b) Process capability

Specification limits: USL=25.06USL = 25.06, LSL=24.94LSL = 24.94 (tolerance =0.12= 0.12 mm).

Cp=USL−LSL6σ=0.126(0.018)=1.11C_p = \frac{USL - LSL}{6\sigma} = \frac{0.12}{6(0.018)} = 1.11 Cpu=USL−μ3σ=25.06−25.010.054=0.926,Cpl=μ−LSL3σ=25.01−24.940.054=1.296C_{pu} = \frac{USL - \mu}{3\sigma} = \frac{25.06-25.01}{0.054} = 0.926, \qquad C_{pl} = \frac{\mu - LSL}{3\sigma} = \frac{25.01-24.94}{0.054} = 1.296 Cpk=min⁡(Cpu,Cpl)=0.926C_{pk} = \min(C_{pu}, C_{pl}) = 0.926

Fraction outside the limits:

zupper=25.06−25.010.018=+2.78,zlower=24.94−25.010.018=−3.89z_{upper} = \frac{25.06 - 25.01}{0.018} = +2.78, \qquad z_{lower} = \frac{24.94 - 25.01}{0.018} = -3.89
  • Above USLUSL: P(z>2.78)=0.00274P(z > 2.78) = 0.00274
  • Below LSLLSL: P(z<−3.89)=0.00005P(z < -3.89) = 0.00005
  • Total ≈0.00279\approx 0.00279, i.e. 0.28 % (about 2800 parts per million)

Comment: Cp>1C_p > 1 means the process spread fits the tolerance, but Cpk<CpC_{pk} < C_p shows that the process is off-centre (mean 0.01 mm above the middle of the tolerance). Re-centring on 25.00 mm would give Cpk=Cp=1.11C_{pk} = C_p = 1.11 and a reject rate of about 0.09 %. A CpkC_{pk} of 1.33 or more is usually required.

Answer: CpC_p = 1.11, CpkC_{pk} = 0.926; about 0.28 % of shafts out of limits.