Skip to main content

Settling tank 20 m long, 3.5 m deep; 0.02 and 0.01 mm

Short answer

Stokes' law vs for 0.02 mm at 25°C = 0.0403 cm/s. Detention time = depth/vs = 350/0.0403 = 2.41 h. Overflow rate v0 = 0.0403 cm/s. At 15°C, vs for 0.01 mm = 0.00790 cm/s; removal = vs/v0 = 19.6%.

In a continuous flow, settling tank 20 m long and 3.5 m deep, what detention time would you recommend for effective removal of 0.02 mm particles at 25°C? Assume specific gravity of particles = 2.65. Also determine the percentage of 0.01 mm particles removed in the same tank at 15°C.

A continuous-flow ideal settling tank removes a particle completely if it settles through the full depth HH during the detention time tt, i.e. vs≥H/tv_s \ge H/t (equivalently vs≥v_s\ge overflow rate v0v_0). So the detention time for 100 % removal is t=H/vst = H/v_s.

(a) Detention time for 0.02 mm at 25 °C

Take Ss=2.65S_s = 2.65, ν25=0.00893\nu_{25} = 0.00893 cm²/s, d=0.002d=0.002 cm, H=3.5H = 3.5 m =350=350 cm.

vs=g(Ss−1)d218ν=981×1.65×0.002218×0.00893=0.0403 cm/sv_s=\frac{g(S_s-1)d^2}{18\nu}=\frac{981\times1.65\times0.002^2}{18\times0.00893}=0.0403\ \text{cm/s}

Re=vsd/ν=0.009<1Re = v_sd/\nu = 0.009<1 (Stokes' law valid).

t=Hvs=3500.0403=8689 s=2.41 ht=\frac{H}{v_s}=\frac{350}{0.0403}=8689\ \text{s} = 2.41\ \text{h}

Recommended detention time ≈2.4\approx 2.4 h. (Horizontal velocity =L/t=2000/8689=0.230=L/t = 2000/8689 = 0.230 cm/s, well below the scour velocity.)

(b) Removal of 0.01 mm particles at 15 °C in the same tank

The tank has overflow rate v0=H/t=0.0403v_0 = H/t=0.0403 cm/s. At 15 °C, ν=0.01139\nu=0.01139 cm²/s, d=0.001d=0.001 cm:

vs=981×1.65×0.001218×0.01139=0.00790 cm/s(Re=0.0007<1)v_s=\frac{981\times1.65\times0.001^2}{18\times0.01139}=0.00790\ \text{cm/s}\quad (Re=0.0007<1) Removal=vsv0=0.007900.0403=0.196⇒19.6 %\text{Removal}=\frac{v_s}{v_0}=\frac{0.00790}{0.0403}=0.196\Rightarrow 19.6\ \%

Answer: detention time = 2.41 h; removal of 0.01 mm particles at 15 °C = 19.6 %.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Water Supply Engineering chapter 6 questions →