Settling tank 15 x 4 x 2.5 m, 96% of 0.015 mm
Short answer
Settling velocity vs for 0.015 mm at 15°C = 0.01776 cm/s. For 96% removal, v0 = vs/0.96 = 0.01850 cm/s; detention time = H/v0 = 250/0.01850 = 3.75 h. vs for 0.020 mm is 0.03158 cm/s > v0, so 100% removal exceeds 99% requirement; tank is sufficient.
In continuous flow settling tank of 15 m length, 4 m width and 2.5 m effective depth, what detention time would you recommend to remove 96% of particles having diameter of 0.015 mm and specific gravity 2.65 at 15°C? Does the tank is enough to remove 99% of particles having size 0.020 mm at same conditions?
In an ideal settling tank the fraction of particles removed is (for ), where is the overflow rate; larger particles are removed completely.
(a) Detention time for 96 % removal of 0.015 mm particles at 15 °C
cm, , cm²/s, cm.
For this detention time the tank (15 m 4 m 2.5 m, volume 150 m³) can pass a flow m³/h m³/day (surface overflow rate m³/m²/day).
(b) Removal of 99 % of 0.020 mm particles
cm at the same temperature:
Compare with the overflow rate cm/s: , so these particles are removed 100 %, which is more than 99 %.
Answer: detention time = 3.75 h (about 225 min); the tank is sufficient, since 0.020 mm particles are removed 100 % (more than the 99 % required).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling tank 20 m long, 3.5 m deep; 0.02 and 0.01 mm · Water Supply Engineering, chapter 6 · asked 3×
- Settling tank 30 m x 3 m, 0.02 mm at 25°C; 0.01 mm at 10°C · Water Supply Engineering, chapter 6 · asked 3×
- Settling tank 30 m x 3 m, 0.03 mm at 25°C; 0.025 mm at 20°C · Water Supply Engineering, chapter 6 · asked 3×
- Settling tank 30 m x 3 m, 0.02 mm, SG 2.50 · Water Supply Engineering, chapter 6
- Settling tank 20 m x 2.5 m; velocity for 0.02 mm · Water Supply Engineering, chapter 6 · asked 2×
- Settling tank 30 m x 3 m; velocity for 0.02 mm · Water Supply Engineering, chapter 6 · asked 2×
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Continuous flow sedimentation tank particle size · Sanitary Engineering, chapter 7
- Settling basin 40 m³/s, 0.15 mm · Hydropower Engineering, chapter 5 · asked 4×