- 2081 Chaitra · 6 marks
Settling basin design for 0.2 mm particles
Short answer
Horizontal velocity by Camp's formula (v = 0.197 m/s), width from continuity (B ≈17.4 m, adopt 17.5 m), length considering turbulence by Velikanov (9.0 m) but ideal settling length 11.48 m governs. Adopted basin dimensions: 12 m long × 17.5 m wide × 3.5 m deep (two chambers).
Design a settling basin for a run-of-river hydropower station, considering turbulence effects using settling theory. The basin should remove particles larger than 0.2 mm in diameter from sand-laden water. Given a design discharge of 12 m³/s and a basin depth of 3.5 m, use w = 6 cm/s and λ = 1.50 for the design.
Given: m³/s, m, particle size mm, fall velocity cm/s m/s, turbulence coefficient .
Method: horizontal velocity by Camp's formula, width from continuity, length by settling theory corrected for turbulence by Velikanov's formula.
1. Horizontal (flow-through) velocity
Camp: cm/s with for mm.
2. Width of basin
3. Length by ideal settling theory (no turbulence)
4. Length considering turbulence (Velikanov)
5. Adopted dimensions
The length must not be less than the ideal settling length, so the larger value (11.48 m) governs; adopt m.
| Item | Value |
|---|---|
| Flow velocity | 0.197 m/s |
| Width | 17.42 m, say 17.5 m (2 chambers of 8.75 m) |
| Settling depth | 3.5 m (+ about 0.5–1.0 m sediment storage) |
| Length (Velikanov) | 9.00 m |
| Length (ideal) | 11.48 m |
| Adopted length | 12 m (+ inlet and outlet transitions) |
Answer: m/s, m, turbulent (Velikanov) length m; adopted basin about 12 m long × 17.5 m wide × 3.5 m deep (split into two chambers for flushing).
Note: the given cm/s is high for 0.2 mm sand (real value about 2–2.5 cm/s); with a smaller the required length becomes much larger, so in practice the basin is made longer, with about 8–10 per chamber.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Settling basin 6 m³/s, 0.25 mm, depth 3 m · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Periodic settling basin with and without turbulence · Hydropower Engineering, chapter 5
- Settling basin 8 m³/s, 0.3 mm, 90% trap · Hydropower Engineering, chapter 5 · asked 2×