- 2073 Bhadra · 8 marks
Settling basin design for 0.25 mm sediment
Short answer
Assumeddepth 4.0 m, fall velocity 0.027 m/s for0.25 mm sand, λ =1.65 for95% efficiency. Camp's velocity v =0.22 m/s, width B ≈11.4 m (adopt 12 m as two 6-m chambers). Velikanov length 78 m governs over ideal 32.6 m; basin 78 m long × 12 m wide ×4 m deep.
With considering turbulent effect, design a settling basin to remove the sediment size greater than 0.25 mm diameter. Assume design discharge of the basin is 10 m³/s and trap efficiency as 95%.
Given: m³/s, particle size mm, trap efficiency .
Assumptions (not given): basin depth m; water at about 20 °C; fall velocity of 0.25 mm quartz sand from the standard fall-velocity table, cm/s m/s; Velikanov coefficient for 95% efficiency (Velikanov table: 90% → 1.28, 95% → 1.65, 98% → 2.05).
1. Horizontal velocity (Camp)
2. Width
3. Ideal settling length (no turbulence)
4. Length considering turbulence (Velikanov)
Turbulent eddies keep particles in suspension longer, so the length is increased:
5. Adopted dimensions
| Item | Value |
|---|---|
| Flow velocity | 0.22 m/s |
| Settling depth | 4.0 m (+ about 1 m for sediment storage) |
| Total width | 11.36 m, say 12 m = 2 chambers × 6 m |
| Ideal length | 32.6 m |
| Length with turbulence | 77.98 m, say 78 m |
| Detention time | s |
Answer: a two-chamber settling basin about 78 m long, 12 m wide (2 × 6 m) and 4 m deep (plus storage depth, inlet and outlet transitions). The turbulence effect more than doubles the length compared with the ideal settling length of 32.6 m. Each chamber has , which gives uniform flow.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Settling basin design principle and components · Hydro Power, chapter 5
- Settling basin 8 m³/s, 0.3 mm, 90% trap · Hydropower Engineering, chapter 5 · asked 2×
- Continuous flushing settling basin, 95% efficiency · Hydropower Engineering, chapter 5
- Settling basin trap efficiency (Camp's diagram) · Hydropower Engineering, chapter 5
- Settling basin 6 m³/s, 0.25 mm, depth 3 m · Hydropower Engineering, chapter 5