- 2081 Asoj · 6 marks
Settling basin design for 0.15 mm particles
Short answer
Using Camp's velocity (v =0.170 m/s), width from continuity (B ≈14.7 m, adopt 15 m), and Velikanov's turbulent length (7.83 m). The greater ideal settling length 11.36 m governs; adopted basin 12 m long × 15 m wide ×4 m deep in two chambers.
Design a settling basin for a ROR hydropower plant considering the turbulent effect by using the settling theory. The basin should serve to remove particles greater than 0.15 mm diameter from the water conveying mainly sand. The design discharge is 10 m³/s and the depth of the basin is 4.0 m. Take w = 6 cm/s and λ = 1.50.
Given: m³/s, m, particle size mm, fall velocity cm/s m/s, .
Method: Camp's formula for flow velocity, continuity for width, settling theory with Velikanov's turbulence correction for length.
1. Horizontal velocity (Camp)
cm/s, for mm:
2. Width
3. Ideal settling length
4. Length considering turbulence (Velikanov)
5. Adopted dimensions
Since the length cannot be less than the ideal settling length, m governs; adopt m.
| Item | Value |
|---|---|
| Flow velocity | 0.170 m/s |
| Width | 14.67 m, say 15 m (2 chambers × 7.5 m) |
| Depth | 4.0 m + sediment storage depth |
| Length (Velikanov) | 7.83 m |
| Length (ideal) | 11.36 m |
| Adopted length | 12 m + inlet/outlet transitions |
Answer: m/s, m, Velikanov length m; adopt a basin about 12 m long × 15 m wide × 4 m deep, divided into two chambers so that one can be flushed while the other operates.
Note: the given cm/s is much larger than the real fall velocity of 0.15 mm sand (about 1.5 cm/s), which is why the computed length is short; with the real value the basin would be several times longer.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Settling basin design principle and components · Hydro Power, chapter 5
- Settling basin 8 m³/s, 0.3 mm, 90% trap · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin 40 m³/s, 0.15 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin 60 m³/s, 0.15 mm, head 100 m · Hydropower Engineering, chapter 5