- Asked 4/21
- 2070 Ashad · 3+3 marks
Settling basin 40 m³/s, 0.15 mm
Short answer
For 40 m³/s trapping particles >0.15 mm (w=0.015 m/s), Camp's v=0.17 m/s, depth 5 m. Three chambers each 16 m wide, turbulence-adjusted length 175 m. Basin: 3 chambers 16 m × 175 m × 5 m settling depth.
Find out the dimension of a settling basin with turbulent flow for a high-head hydropower plant, which utilizes a discharge of 40 m³/s. The sediment particles coarser than 0.15 mm (w = 1.5 cm/s) have to be trapped in the basin. Draw plan and sections (cross and longitudinal) showing major components and flushing arrangement.
Given: design discharge m³/s; particles of size mm to be trapped, fall velocity cm/s m/s (given). Turbulence is considered; the plan and both sections are sketched.
Step 1: Horizontal velocity (Camp)
For mm, with (v in cm/s, d in mm):
This is within the usual 0.1-0.4 m/s range, so deposited sediment is not re-suspended.
Step 2: Cross-section and width
Assume a flow depth m in the settling zone (sediment storage is extra).
Provide chambers so that one can be flushed while the others work: m each, adopt 16.0 m.
Step 3: Length without turbulence
Step 4: Effect of turbulence
Turbulence reduces the effective fall velocity: , with .
Adopted dimensions
| Item | Value |
|---|---|
| Flow velocity | 0.170 m/s |
| Settling depth | 5.0 m (plus about 1.0 m sediment storage in the hopper) |
| Number of chambers | 3 |
| Width of each chamber | 16.0 m |
| Length of settling zone | 175 m |
| Length/width ratio | 10.9 |
| Inlet transition | gradual, with guide vanes (side slope not steeper than about 1:5) |
Total volume of water in the basin m³.
PLAN (flushing gates at the downstream end)
inlet settling chambers outlet
canal transition +=================+ transition
=====> \ / | chamber 1 | \ /===> to
/ guide \ +-----------------+ / weir \ headrace
=====> \ vanes / | chamber 2 | \ /
/ \ +-----------------+ / \
| chamber 3 |
+=================+
trash- | | | flush gates
rack v v v --> flushing channel --> river
LONGITUDINAL SECTION
inlet settling zone (depth H) outlet
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
\ ---> ---> ---> ---> ---> ---> |
\ ______________________________________ | weir
\/ sediment storage / hopper slope 1:30 \__|__ to headrace
flush gate -> flushing channel -> river
CROSS-SECTION (across the three chambers)
|<-- 16.0 m -->|<-- 16.0 m -->|<-- 16.0 m -->|
WL ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ free board 0.5 m
| | | | ^
| chamber 1 | chamber 2 | chamber 3 | | H = 5.0 m
| | | | v
\ /\ /\ / ^ sediment storage
\____ ____/ \____ ____/ \____ ____/ v (hopper, ~1.0 m)
|__| |__| |__|
flushing channel under each chamber (to its flush gate)
Flushing arrangement: the floor of each chamber slopes at about 1:30-1:50 to a longitudinal flushing channel with a flushing gate at the downstream end. A flushing velocity of at least 3 m/s is maintained in the channel. The chamber to be flushed is closed at the inlet, drained and flushed to the river, while the other chambers continue to supply the plant.
Answer: 3 chambers, each about 16.0 m wide x 175 m long x 5.0 m deep (settling zone), with m/s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin 50 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 25 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin 60 m³/s, 0.15 mm, head 100 m · Hydropower Engineering, chapter 5
- Continuous flushing settling basin, 95% efficiency · Hydropower Engineering, chapter 5
- Desilting basin 32 m³/s, 0.15 mm · Hydropower Engineering, chapter 5
- Settling basin with Hazen coefficient and sediment depth · Hydropower Engineering, chapter 5
- Settling basin 8 m³/s, 0.3 mm, 90% trap · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×