- 2082 Baishakh · 5+2 marks
Desilting basin 32 m³/s, 0.15 mm
Short answer
Use Camp velocity v=44 sqrt(0.15)=0.1704 m/s. With two chambers and H=5 m, adopt 19 m width per chamber. Required length is 57.7 m by Velikanov, so adopt 60 m. Final: two chambers 19 m x 60 m, depth 5 m plus sediment storage.
Determine the dimensions of a desilting basin for a high head hydropower plant with a discharge of 32 m³/s. The basin must trap sediment particles coarser than 0.15 mm. Take w = 0.025 m/s and λ = 1.5. Additionally, draw a plan and longitudinal section of the desilting basin, illustrating the major components and the flushing arrangement.
Given: m³/s, particles coarser than 0.15 mm, m/s, (Velikanov's coefficient for turbulence and the required efficiency). For a high-head plant, two chambers are provided so that one can be flushed while the other works.
Step 1: Horizontal velocity (Camp)
Step 2: Depth and width
Assume a flow depth m:
Adopt a chamber width of 19.0 m.
Step 3: Length by simple settling theory
Without turbulence: m.
Using as a factor on the surface area:
Step 4: Check by Velikanov's method
The larger length governs. Adopt m, giving .
| Item | Value |
|---|---|
| Number of chambers | 2 |
| Width of each chamber | 19.0 m |
| Length | 60 m |
| Flow depth | 5 m (+ 1.0 m sediment storage in the hopper) |
| Velocity | 0.1704 m/s |
PLAN (flushing gates at the downstream end)
inlet settling chambers outlet
canal transition +=================+ transition
=====> \ / | chamber 1 | \ /===> to
/ guide \ +-----------------+ / weir \ headrace
=====> \ vanes / | chamber 2 | \ /
/ \ +=================+ / \
trash- | | flush gates
rack v v --> flushing channel --> river
LONGITUDINAL SECTION
inlet settling zone (depth H) outlet
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
\ ---> ---> ---> ---> ---> ---> |
\ ______________________________________ | weir
\/ sediment storage / hopper slope 1:30 \__|__ to headrace
flush gate -> flushing channel -> river
Flushing arrangement: each chamber has a hopper floor sloping (about 1:30) to a central flushing channel, with a flushing gate at the downstream end. To flush a chamber, its inlet gate is closed and the deposit is flushed out while the other chamber carries the flow. The flushing water runs through the flushing tunnel to the river.
Answer: 2 chambers, each 19.0 m wide x 60 m long x 5 m deep (plus storage).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin 40 m³/s, 0.15 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 60 m³/s, 0.15 mm, head 100 m · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 50 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 25 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×