- Asked 2/21
- 2076 Ashwin · 8+4 marks
- 2075 Ashwin · 7 marks
Settling basin 60 m³/s, 0.15 mm, head 300 m
Short answer
Use Camp velocity v=44√0.15=0.170 m/s, depth 6 m, total width 58.7 m split into 3 chambers of 20 m. Turbulence reduces fall velocity to 0.0058 m/s, giving length 175.8 m, adopted 180 m. Basin: 3 chambers, each 20 m wide x 180 m long x 6 m deep.
Design a settling basin for a high head project in a river which utilizes 60 m³/s discharge and gross head of 300 m. The sediment particles larger than 0.15 mm (fall velocity = 1.5 cm/s) need to be trapped in the basin. Consider the effect of turbulence as well. Also draw the plan and section of the basin showing major components.
Given: design discharge m³/s and gross head 300 m (a high-head Pelton plant, so particles above 0.15 mm must be removed); particles of size mm to be trapped, fall velocity cm/s m/s (given). Turbulence is considered.
Step 1: Horizontal velocity (Camp)
For mm, with (v in cm/s, d in mm):
This is within the usual 0.1-0.4 m/s range, so deposited sediment is not re-suspended.
Step 2: Cross-section and width
Assume a flow depth m in the settling zone (sediment storage is extra).
Provide chambers so that one can be flushed while the others work: m each, adopt 20.0 m.
Step 3: Length without turbulence
Step 4: Effect of turbulence
Turbulence reduces the effective fall velocity: , with .
Adopted dimensions
| Item | Value |
|---|---|
| Flow velocity | 0.170 m/s |
| Settling depth | 6.0 m (plus about 1.0 m sediment storage in the hopper) |
| Number of chambers | 3 |
| Width of each chamber | 20.0 m |
| Length of settling zone | 180 m |
| Length/width ratio | 9.0 |
| Inlet transition | gradual, with guide vanes (side slope not steeper than about 1:5) |
Total volume of water in the basin m³.
PLAN (flushing gates at the downstream end)
inlet settling chambers outlet
canal transition +=================+ transition
=====> \ / | chamber 1 | \ /===> to
/ guide \ +-----------------+ / weir \ headrace
=====> \ vanes / | chamber 2 | \ /
/ \ +-----------------+ / \
| chamber 3 |
+=================+
trash- | | flush gates
rack v v --> flushing channel --> river
LONGITUDINAL SECTION
inlet settling zone (depth H) outlet
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
\ ---> ---> ---> ---> ---> ---> |
\ ______________________________________ | weir
\/ sediment storage / hopper slope 1:30 \__|__ to headrace
flush gate -> flushing channel -> river
Flushing arrangement: the floor of each chamber slopes at about 1:30-1:50 to a longitudinal flushing channel with a flushing gate at the downstream end. A flushing velocity of at least 3 m/s is kept in the channel. The chamber to be flushed is closed at the inlet, drained and flushed to the river, while the other chambers continue to supply the plant.
Answer: 3 chambers, each about 20.0 m wide x 180 m long x 6.0 m deep (settling zone), with m/s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin 60 m³/s, 0.15 mm, head 100 m · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 40 m³/s, 0.15 mm · Hydropower Engineering, chapter 5 · asked 4×
- Continuous flushing settling basin, 95% efficiency · Hydropower Engineering, chapter 5
- Settling basin 50 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 25 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Tractive force design for 15 cumecs, 5 cm particles · Hydraulics, chapter 10 · asked 2×