Settling basin with Hazen coefficient and sediment depth

Short answer

Stokes fall velocity is 0.2416 m/s; with 15% flushing flow Q'=13.8 m³/s, Hazen minimum area is 159 m². Adopt 8 m wide by 32 m long by 6 m deep plus a 1.0 m hopper, giving v=0.29 m/s and trap efficiency 96.6%; sediment depth is about 0.71 m per hour.

Design a settling basin for particle size = 6 mm, sp. gravity = 2.65, absolute viscosity = 1.34 gm/cm-s, temperature of water = 20°C, discharge = 12 m³/s. Calculate the depth of sediment assuming concentration is 5000 ppm. Assume 15% flushing discharge and performance coefficient of Hazen = 0.16. Draw a neat sketch of plan and section.

Given: particle diameter d=6d=6 mm =0.6=0.6 cm, s=2.65s=2.65, μ=1.34\mu=1.34 g/cm·s, T=20∘T=20^\circC, Q=12Q=12 m³/s, concentration 5000 ppm (5 kg/m³), flushing discharge 15%, Hazen's performance coefficient n=0.16n=0.16.

Assumptions: required trap efficiency η=90%\eta=90\%; sediment bulk density 1325 kg/m³ (packing factor 0.5 of 2650 kg/m³); the basin is flushed every 1 hour; horizontal velocity not more than 0.3 m/s; L/B=4L/B=4.

Step 1: Fall velocity (Stokes, with the data given)

w=g d2(ρs−ρ)18μ=981×0.62×(2.65−1)18×1.34=24.16 cm/s=0.2416 m/sw=\frac{g\,d^2(\rho_s-\rho)}{18\mu}=\frac{981\times0.6^2\times(2.65-1)}{18\times1.34}=24.16\ \text{cm/s}=0.2416\ \text{m/s}

Step 2: Design flow with flushing

Q′=1.15×12=13.8 m3/sQ'=1.15\times12=13.8\ \text{m}^3/\text{s}

Step 3: Surface area (Hazen)

Hazen's relation for the fraction removed is   1−η=[1+nw AQ′]−1/n\;1-\eta=\left[1+n\dfrac{w\,A}{Q'}\right]^{-1/n}, so

A=Q′n w[(1−η)−n−1]=13.80.16×0.2416[(0.1)−0.16−1]=159.0 m2A=\frac{Q'}{n\,w}\left[(1-\eta)^{-n}-1\right]=\frac{13.8}{0.16\times0.2416}\left[(0.1)^{-0.16}-1\right]=159.0\ \text{m}^2

This is the minimum surface area.

Step 4: Cross-section and plan size

To stop the settled sediment from being scoured, the horizontal velocity is limited to 0.3 m/s:

Ac=Q′v=13.80.3=46 m2A_c=\frac{Q'}{v}=\frac{13.8}{0.3}=46\ \text{m}^2

With L/B=4L/B=4, adopt B=8B=8 m, flow depth H=6H=6 m and L=32L=32 m:

v=13.88×6=0.29 m/s (OK),A=8×32=256 m2>159 m2 (OK)v=\frac{13.8}{8\times6}=0.29\ \text{m/s}\ (\text{OK}),\qquad A=8\times32=256\ \text{m}^2>159\ \text{m}^2\ (\text{OK})

(A shallow 2 m deep basin of the Hazen area alone would give v≈1v\approx1 m/s, which is far too fast.)

Trap efficiency of the adopted basin:

η=1−[1+0.16×0.2416×25613.8]−1/0.16=1−(1.717)−6.25=96.6%\eta=1-\left[1+0.16\times\frac{0.2416\times256}{13.8}\right]^{-1/0.16}=1-(1.717)^{-6.25}=96.6\%

Step 5: Depth of sediment

Concentration 50005000 ppm =5=5 kg/m³. Sediment trapped per hour:

M=η C Q′ t=0.966×5×13.8×3600=239930 kgM=\eta\,C\,Q'\,t=0.966\times5\times13.8\times3600=239930\ \text{kg} Vs=M1325=181.1 m3,hs=VsA=181.1256=0.71 mV_s=\frac{M}{1325}=181.1\ \text{m}^3,\qquad h_s=\frac{V_s}{A}=\frac{181.1}{256}=0.71\ \text{m}

So the sediment builds up to about 0.71 m depth in one hour. A hopper depth of about 1.0 m is therefore provided, and the basin must be flushed at least once every hour (or continuously, using the 15% flushing discharge).

PLAN (flushing gate at the downstream end)
          inlet           settling basin            outlet
 canal   transition  +========================+   transition
 =====>  \  guide  / |                        | \  weir   /===> to
         /  vanes  \ |   8 m wide x 32 m long | /         \    headrace
                     +========================+
  trash-                          |  flush gate
  rack                            v  --> flushing channel --> river
LONGITUDINAL SECTION
 inlet          settling zone (H = 6 m)       outlet
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~  WL
 \    --->   --->   --->   --->   --->   --->  |
  \  ______________________________________   | weir
   \/   sediment hopper (about 1.0 m)        \__|__ to headrace
          flush gate -> flushing channel -> river

Answer: basin about 8 m wide x 32 m long x 6 m flow depth (plus a 1.0 m hopper), v=0.29v=0.29 m/s, trap efficiency about 96.6%; the sediment depth is about 0.71 m per hour of operation.

Note: the 6 mm size and the viscosity of 1.34 g/cm·s are used exactly as given (water at 20°C actually has μ≈0.01\mu\approx0.01 g/cm·s). Stokes' law is not strictly valid for such large particles, so the fall velocity is only indicative.