Single chamber settling basin design (15 m³/s)
Short answer
Use design flow 16.5 m3/s. Basin area = 1.5 x 16.5 / 0.02 = 1237.5 m2; with L/B=8 adopt 13 m x 104 m. Depth 4.5 m gives velocity 0.282 m/s. Sediment per 8-h cycle is 380.2 m3, so provide 0.5 m storage.
Design a single chamber settling basin using the following data: design discharge = 15 m³/sec; particle size to settle ≥ 0.2 mm; particle fall velocity = 0.02 m/sec; factor of safety for basin area = 1.5; length to breadth ratio = 8; sediment concentration = 1 kg/m³; density of sediment particles = 2,500 kg/m³; settling time of sediment particles = 8 hours; sediment packing factor = 0.5; additional discharge for flushing = 10%.
Given: m³/s, particles mm, m/s, factor of safety for area , , sediment concentration kg/m³, particle density 2500 kg/m³, flushing interval 8 h, packing factor 0.5, additional flushing discharge 10%.
Step 1: Design flow
Step 2: Surface area of the basin
For a particle to settle, the surface area must satisfy . With the factor of safety:
Step 3: Width and length ()
Adopt m and m ( m²).
Step 4: Depth of flow
Limit the horizontal velocity to about 0.3 m/s. Take the flow depth m:
Step 5: Sediment storage (flushing every 8 h)
(All the sediment entering is assumed to be trapped, which is conservative.)
Step 6: Overall dimensions
| Item | Value |
|---|---|
| Length of settling zone | 104 m |
| Width | 13 m |
| Flow depth | 4.5 m |
| Sediment storage | 0.5 m (hopper with 1:30 slope to the flushing channel) |
| Free board | 0.5 m |
| Total depth at the upstream end | about 5.5 m |
PLAN (single chamber, flushing gate at the downstream end)
inlet settling chamber outlet
canal transition +========================+ transition
=====> \ guide / | | \ weir /===> to
/ vanes \ | 13 m wide x 104 m long| / \ headrace
+========================+
trash- | flush gate
rack v --> flushing channel --> river
Answer: a single chamber of about 13 m x 104 m, with a flow depth of 4.5 m ( m/s) and 0.5 m of sediment storage, flushed every 8 hours (deposit of 380.2 m³ per cycle).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin with Hazen coefficient and sediment depth · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.15 mm, head 100 m · Hydropower Engineering, chapter 5
- Settling basin 40 m³/s, 0.15 mm · Hydropower Engineering, chapter 5 · asked 4×
- Desander design, two basins (16 m³/s) · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Settling velocity of silica particle 0.02 cm at 20°C · Water Supply Engineering, chapter 6
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling tank 20 m x 2.5 m; velocity for 0.02 mm · Water Supply Engineering, chapter 6 · asked 2×