- 2080 Bhadra · 7 marks
Settling basin 6 m³/s, 0.25 mm, depth 3 m
Short answer
Camp velocity is 44 sqrt(0.25)=0.220 m/s. For Q=6 m3/s and H=3 m total width is 9.09 m; provide two chambers 5 m wide. Turbulence reduces fall velocity to 0.0082 m/s, requiring length 80.2 m, adopt 85 m. Final: two 5 m x 85 m x 3 m chambers.
Design a settling basin for a design discharge of 6 cumec. The basin is designed to remove particle size of 0.25 mm. If the depth of the basin is 3 m and settling velocity 2.5 cm/sec, find the dimensions of the basin considering turbulence.
Given: design discharge m³/s; particles of size mm to be trapped, fall velocity cm/s m/s (given). The depth of the basin is 3 m, and turbulence is considered.
Step 1: Horizontal velocity (Camp)
For mm, with (v in cm/s, d in mm):
This is within the usual 0.1-0.4 m/s range, so deposited sediment is not re-suspended.
Step 2: Cross-section and width
Take the flow depth m in the settling zone (given; sediment storage is extra).
Provide chambers so that one can be flushed while the other works: m each, adopt 5.0 m.
Step 3: Length without turbulence
Step 4: Effect of turbulence
Turbulence reduces the effective fall velocity: , with .
Adopted dimensions
| Item | Value |
|---|---|
| Flow velocity | 0.220 m/s |
| Settling depth | 3.0 m (plus about 1.0 m sediment storage in the hopper) |
| Number of chambers | 2 |
| Width of each chamber | 5.0 m |
| Length of settling zone | 85 m |
| Length/width ratio | 17.0 |
| Inlet transition | gradual, with guide vanes (side slope not steeper than about 1:5) |
Total volume of water in the basin m³.
PLAN (flushing gates at the downstream end)
inlet settling chambers outlet
canal transition +=================+ transition
=====> \ / | chamber 1 | \ /===> to
/ guide \ +-----------------+ / weir \ headrace
=====> \ vanes / | chamber 2 | \ /
/ \ +=================+ / \
trash- | | flush gates
rack v v --> flushing channel --> river
LONGITUDINAL SECTION
inlet settling zone (depth H) outlet
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
\ ---> ---> ---> ---> ---> ---> |
\ ______________________________________ | weir
\/ sediment storage / hopper slope 1:30 \__|__ to headrace
flush gate -> flushing channel -> river
Flushing arrangement: the floor of each chamber slopes at about 1:30-1:50 to a longitudinal flushing channel with a flushing gate at the downstream end. A flushing velocity of at least 3 m/s is maintained in the channel. The chamber to be flushed is closed at the inlet, drained and flushed to the river, while the other chamber continues to supply the plant.
Answer: 2 chambers, each about 5.0 m wide x 85 m long x 3.0 m deep (settling zone), with m/s.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Periodic settling basin with and without turbulence · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin 25 m³/s, 0.2 mm · Hydropower Engineering, chapter 5 · asked 4×
- Settling basin with Hazen coefficient and sediment depth · Hydropower Engineering, chapter 5
- Settling basin 8 m³/s, 0.3 mm, 90% trap · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Settling velocity of discrete particle 0.14 mm at 25°C · Water Supply Engineering, chapter 6 · asked 2×
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5