- 2072 Asoj · 7 marks
Settling basin design principle and components
Short answer
A settling basin reduces velocity to settle out sediment; length is L ≥ h v / w. Design criteria target particle size (0.2 mm), horizontal velocity (0.2–0.4 m/s), and at least two chambers. Components: inlet transition, settling and storage zones, flushing system, outlet weir, and spillway.
Explain the design principle and criteria of settling basin with neat sketches of basin and discuss the different component of the basin.
A settling basin (desander) is an enlarged chamber in the water conductor system where the flow velocity is reduced so that suspended sediment particles larger than a chosen size settle out before the water reaches the turbines. In Nepalese Himalayan rivers the silt load is very high and quartz-rich, so desanders are essential to prevent turbine abrasion.
Design principle
The basin works on the settling theory: a particle entering at the water surface at depth moves forward with the flow velocity and falls with its fall (settling) velocity . It is trapped if it reaches the bed before the end of the basin.
Width . In practice turbulence reduces the effective fall velocity, so the length is increased using Velikanov's or Sakhmin's methods, e.g. Velikanov:
where depends on the required trap efficiency.
Design criteria
- Particle size to be removed: usually 0.2–0.3 mm for medium heads; 0.1–0.15 mm for high-head Pelton plants (Nepal practice: 0.2 mm, or 0.15 mm for heads above about 250 m).
- Trap efficiency: generally 90% or more for the design particle size.
- Horizontal velocity: low enough to avoid resuspension; by Camp, cm/s ( for mm), usually 0.2–0.4 m/s.
- Uniform flow distribution: gradual inlet transition (expansion about 1:5 to 1:8) and baffles/guide walls.
- Depth: usually 3–6 m plus extra depth for sediment storage.
- Flushing: sediment must be removed periodically or continuously (hydraulic flushing, Bieri system, Serpent system); flushing discharge must be available.
- Number of chambers: at least two chambers so that one can be flushed while the other runs.
- L/B ratio: generally 8–10 for good flow; a large width is split into several chambers.
Components of a settling basin
PLAN
inlet settling zone outlet
from ________ ___________________ ________
intake \ | | | | / to
------> > ---| | (two chambers) | |--- < headrace
______ /_____| |___________________| |_____\
transition weir/transition
L-SECTION
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
\ inlet | settling zone |outlet
\________|________________________|
sediment storage -> flushing canal/gate
- Inlet zone (transition): gradually expanding section with guide walls or baffles that slows the water and spreads it uniformly over the basin width.
- Settling zone: the main chamber of required length, width and depth where particles settle.
- Sediment storage zone: extra depth below the settling zone, with sloping or hopper-shaped bed, where deposits collect.
- Flushing system: flushing gates, conduits or channels with sufficient slope to return deposits to the river.
- Outlet zone: converging transition and overflow weir that collect clear surface water into the headrace without disturbing the settled sediment.
- Spillway/escape: a side spillway to release excess water and protect the basin.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Settling basin design for 0.2 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.15 mm particles · Hydro Power, chapter 5
- Settling basin design for 0.25 mm sediment · Hydro Power, chapter 5
- Why settling basins are essential in Nepal · Hydro Power, chapter 5 · asked 4×
- Desander and its design criteria · Hydro Power, chapter 5 · asked 4×
- Surge tank functions and design criteria · Hydro Power, chapter 5 · asked 2×
- Single chamber settling basin design (15 m³/s) · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.15 mm, head 300 m · Hydropower Engineering, chapter 5 · asked 2×
- Continuous settling basin (10 m³/s) · Hydropower Engineering, chapter 5
- Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s · Hydropower Engineering, chapter 5 · asked 4×