A settling basin reduces velocity to settle out sediment; length is L ≥ h v / w. Design criteria target particle size (0.2 mm), horizontal velocity (0.2–0.4 m/s), and at least two chambers. Components: inlet transition, settling and storage zones, flushing system, outlet weir, and spillway.

Explain the design principle and criteria of settling basin with neat sketches of basin and discuss the different component of the basin.

A settling basin (desander) is an enlarged chamber in the water conductor system where the flow velocity is reduced so that suspended sediment particles larger than a chosen size settle out before the water reaches the turbines. In Nepalese Himalayan rivers the silt load is very high and quartz-rich, so desanders are essential to prevent turbine abrasion.

Design principle

The basin works on the settling theory: a particle entering at the water surface at depth hh moves forward with the flow velocity vv and falls with its fall (settling) velocity ww. It is trapped if it reaches the bed before the end of the basin.

Time to settle t=hw,time to pass =LvCondition: Lv≥hw  ⇒  L≥h vw\begin{aligned} \text{Time to settle } t &= \frac{h}{w}, \quad \text{time to pass } = \frac{L}{v} \\ \text{Condition: } \frac{L}{v} &\ge \frac{h}{w} \;\Rightarrow\; L \ge \frac{h\,v}{w} \end{aligned}

Width B=Qv hB = \dfrac{Q}{v\,h}. In practice turbulence reduces the effective fall velocity, so the length is increased using Velikanov's or Sakhmin's methods, e.g. Velikanov:

L=λ2v2(h−0.2)27.51 w2L = \frac{\lambda^2 v^2 (\sqrt{h} - 0.2)^2}{7.51\,w^2}

where λ\lambda depends on the required trap efficiency.

Design criteria

  1. Particle size to be removed: usually 0.2–0.3 mm for medium heads; 0.1–0.15 mm for high-head Pelton plants (Nepal practice: 0.2 mm, or 0.15 mm for heads above about 250 m).
  2. Trap efficiency: generally 90% or more for the design particle size.
  3. Horizontal velocity: low enough to avoid resuspension; by Camp, v=adv = a\sqrt{d} cm/s (a=44a = 44 for 0.1<d<10.1 < d < 1 mm), usually 0.2–0.4 m/s.
  4. Uniform flow distribution: gradual inlet transition (expansion about 1:5 to 1:8) and baffles/guide walls.
  5. Depth: usually 3–6 m plus extra depth for sediment storage.
  6. Flushing: sediment must be removed periodically or continuously (hydraulic flushing, Bieri system, Serpent system); flushing discharge must be available.
  7. Number of chambers: at least two chambers so that one can be flushed while the other runs.
  8. L/B ratio: generally 8–10 for good flow; a large width is split into several chambers.

Components of a settling basin

 PLAN
        inlet        settling zone        outlet
 from  ________   ___________________   ________
 intake  \     | |                   | |     /  to
 ------>  > ---| |   (two chambers)  | |--- <   headrace
 ______  /_____| |___________________| |_____\
        transition                  weir/transition

 L-SECTION
  ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
   \  inlet  |   settling zone        |outlet
    \________|________________________|
     sediment storage  ->  flushing canal/gate
  1. Inlet zone (transition): gradually expanding section with guide walls or baffles that slows the water and spreads it uniformly over the basin width.
  2. Settling zone: the main chamber of required length, width and depth where particles settle.
  3. Sediment storage zone: extra depth below the settling zone, with sloping or hopper-shaped bed, where deposits collect.
  4. Flushing system: flushing gates, conduits or channels with sufficient slope to return deposits to the river.
  5. Outlet zone: converging transition and overflow weir that collect clear surface water into the headrace without disturbing the settled sediment.
  6. Spillway/escape: a side spillway to release excess water and protect the basin.