Desander and its design criteria

Short answer

A desander is a settling basin to remove suspended sand by slowing flow. It removes particles 0.1-0.5 mm with ≥90% trap efficiency at velocity 0.2-0.4 m/s, using Camp's Vc=a√d. Surface area A=Q/w, L/B 4-10, two chambers, flushing slope 1:20-1:50, spillway and gradual transitions.

What is desander? Discuss its design criteria.

Desander

A desander (settling basin) is a structure placed after the intake (and gravel trap) of a hydropower scheme, in which the flow is slowed down so that suspended sand particles larger than a design size settle and are flushed out, protecting the headrace and turbines from abrasion.

         +---------------------------+
 from -->| inlet  | settling zone  | outlet |--> headrace
 intake  | trans. |  V = 0.2-0.4   | weir   |
         +--------+----------------+--------+
                    \____ sediment ____/ -> flushing

Design criteria

  1. Design particle size: 0.2 mm for medium heads; 0.1–0.15 mm for high-head Pelton plants; up to 0.5 mm for low heads. Smaller size for hard quartz sediment.
  2. Trap efficiency: 90% or more of the design particle size should be removed.
  3. Flow velocity: horizontal velocity below critical (scouring) velocity, by Camp's formula Vc=adV_c = a\sqrt{d} (cm/s, d in mm; a = 44 for 0.1 < d < 1 mm). Typical 0.2–0.4 m/s.
  4. Fall velocity: from Stokes' law or standard curves (e.g. about 0.021 m/s for 0.2 mm quartz at 20 °C).
  5. Dimensions:
    • Surface area A=BL=Q/wA = BL = Q/w for ideal settling.
    • Length L=hVwL = \dfrac{hV}{w}, corrected for turbulence (Camp or Vetter's equation η=1−e−wA/Q\eta = 1 - e^{-wA/Q}).
    • Depth 3–5 m (plus sediment storage depth); L/BL/B about 4–10.
  6. Transitions: gradual inlet expansion (1:5 to 1:8) and outlet contraction to give uniform flow with no dead zones; guide walls/baffles if needed.
  7. Number of chambers: at least two parallel chambers so the plant runs during flushing or repair.
  8. Flushing arrangement: continuous or intermittent hydraulic flushing with gates/pipes; bed slope about 1:20–1:50; enough head to return sediment to the river.
  9. Spillway/overflow: to release excess water.
  10. Location: stable ground, close to the intake, with space for flushing return.