- 2069 Poush · 5 marks
Limestone true thickness across stream
Short answer
True thickness for sloping ground: t = w sinθ sinδ – h cosδ. With breadth w=2100 m, strike N30°W, dip 50°SW, stream south, height drop h=900 m, θ=30°, t = 2100 sin30° sin50° – 900 cos50° = 225.8 m.
A stream flows in a southerly direction across a limestone that strikes N30°W and dips 50°SW. Determine the true thickness of the limestone if the base of the limestone is exposed at an altitude of 2900 m and the top is exposed at an altitude of 2000 m. The breadth of the limestone along the stream is 2100 m.
Principle: the true thickness is the perpendicular distance between the top and bottom surfaces of the bed. When the traverse is on sloping ground it is computed from the horizontal distance along the traverse and the difference in height.
Given
Strike N30°W (330°), dip 50° SW (dip direction 240°). Stream flows south (180°). Horizontal distance (breadth) along the stream m. Base is at 2900 m and top at 2000 m, so the height difference m (the ground falls from base to top, i.e. downstream, which is in the dip direction).
Step 1: angle between traverse and strike
Strike line 330° (or 150°); traverse bearing 180°: .
Step 2: thickness for level ground
Step 3: correction for slope of ground
The ground falls in the direction of dip, so the height difference reduces the thickness:
Answer: true thickness of the limestone = 225.8 m (about 226 m).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Limestone true thickness: A 600 m N28E, C 400 m S10W · Engineering Geology II, chapter 6 · asked 2×
- True thickness: limestone vertical 600 m · Engineering Geology II, chapter 7
- True dip from two apparent dips · Engineering Geology II, chapter 6
- True thickness from vertical thickness 150 m · Engineering Geology II, chapter 6
- True thickness from apparent thickness 210 m · Engineering Geology II, chapter 6
- Limestone reserve for cement factory · Engineering Geology II, chapter 7
- Resistance of alloy sheet along length and thickness · Basic Electrical Engineering, chapter 1
- IDMT relays across 132/33 kV transformer (2000 A) · Switchgear and Protection, chapter 7
- Normal: 2000 students above 60%, top 100 · Probability and Statistics, chapter 3
- True length of base line AB (four bays) · Surveying I, chapter 2