Limestone true thickness: A 600 m N28E, C 400 m S10W

Short answer

From the three borehole depths, vertical thickness is 60 m. The top-of-bed plane dips 3.9° towards SSE (dip direction 147°), strike N57.4°E. True thickness = 60 × cos(3.9°) = 59.9 m.

Three boreholes A, B and C were drilled for limestone reserve calculation. Borehole A lies at 600 m distance due N28°E from borehole B. Borehole C lies at 400 m distance due S10°W from borehole B. The top and bottom of the limestone bed were encountered at the following depths of the given boreholes.

BoreholeTop (m)Bottom (m)
A200260
B220280
C240300

Calculate the true thickness of the limestone bed.

Method: the top of the limestone is at 200 m, 220 m and 240 m depth in A, B and C. All three boreholes are vertical and the bed is 60 m thick in each (260 - 200 = 280 - 220 = 300 - 240 = 60 m), so 60 m is the vertical thickness. First find the attitude of the bed (three-point problem), then convert vertical thickness to true thickness.

Step 1: coordinates (B at origin, x east, y north)

A:x=600sin⁡28∘=281.68 m, y=600cos⁡28∘=529.77 mC:x=400sin⁡190∘=−69.46 m, y=400cos⁡190∘=−393.92 m\begin{aligned} A &: x = 600\sin 28^\circ = 281.68\ \text{m},\ y = 600\cos 28^\circ = 529.77\ \text{m} \\ C &: x = 400\sin 190^\circ = -69.46\ \text{m},\ y = 400\cos 190^\circ = -393.92\ \text{m} \end{aligned}

Step 2: plane of the top of the bed

Depth to the top: d=220+ax+byd = 220 + a x + b y. Substituting A and C:

200=220+281.68a+529.77b240=220−69.46a−393.92b\begin{aligned} 200 &= 220 + 281.68a + 529.77b \\ 240 &= 220 - 69.46a - 393.92b \end{aligned}

Solving gives a=0.0366a = 0.0366 and b=−0.0572b = -0.0572 (metres of depth per metre).

Step 3: dip and dip direction

tan⁡δ=a2+b2=0.0680⇒δ=3.89∘\tan\delta = \sqrt{a^2+b^2} = 0.0680 \Rightarrow \delta = 3.89^\circ

The bed becomes deeper towards the direction (a,b)(a,b), so the dip direction is arctan⁡(a/b)\arctan(a/b) measured from north = 147.38∘147.38^\circ (toward SSE). The strike is perpendicular to this: 57.38∘57.38^\circ, i.e. N57.4°E.

Attitude of the bed: N57.4°E / 3.9° towards SSE (dip direction 147°).

Step 4: true thickness

t=tvcos⁡δ=60cos⁡3.89∘=59.86 mt = t_v\cos\delta = 60\cos 3.89^\circ = 59.86\ \text{m}

(The bed is almost flat, so the true thickness is only slightly less than 60 m.)

Answer: true thickness of the limestone = 59.86 m (about 59.9 m); bed dips 3.9° towards SSE.