- 2075 Baisakh · 5 marks
Tunnel alignment from three boreholes
Short answer
Using three-point method, bedrock surface strikes N16.5°E and dips 20.6° towards ESE (107°). A tunnel aligned along the strike (N16.5°E) maintains constant rock cover and uniform conditions, making it the most suitable.
For a hydropower project, a tunnel alignment has to be selected. The overburden depth is confirmed from drilling of three boreholes, where the top of the bedrock is encountered as follows. From BH#1 to BH#2, at distance of 1000 m along N32°E; from BH#1 to BH#3, at distance of 800 m along S73°E. Depths of bedrock: BH#1 = -200 m, BH#2 = -300 m, BH#3 = -500 m. Select a suitable alignment of the tunnel with respect to the attitude of bedrock.
A bed is a plane, so its level changes uniformly in plan: , where and are the rates of change of level per metre east and north. This is the analytical form of the three-point (strike-line) method.
Coordinates (BH#1 at origin)
Levels of top of bedrock: BH#1 = -200 m, BH#2 = -300 m, BH#3 = -500 m.
Plane of the top of bedrock
:
Solving: , .
Dip, dip direction and strike
The bed descends toward the direction = 106.5° (ESE), so the strike is , i.e. N16.5°E.
So the top of the bedrock dips 20.6° towards 107° (ESE); strike N16.5°E.
Selecting the alignment
- Along the strike (about N16.5°E - S16.5°W) the surface of the bedrock is horizontal, so the depth of overburden and the rock cover above the tunnel stay constant, the tunnel stays in the same stratum, and the beds meet the tunnel roof uniformly. This gives the most uniform conditions and easiest support design.
- Along the dip (towards 107°) the bedrock drops m for each metre (about 20.6° slope), so the tunnel would pass from deep rock to shallow cover or soil, and would cross different beds.
Answer: the bedrock surface strikes N16.5°E and dips 20.6° towards ESE (107°). A tunnel driven along the strike direction (N16.5°E) at a constant level below the bedrock surface is most suitable.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Bedrock attitude: A 700 m N23E, C S71W · Engineering Geology II, chapter 6
- Quartz significance for hydropower project · Engineering Geology II, chapter 1
- Sandstone attitude: A N45W 900 m, C S20E 700 m · Engineering Geology II, chapter 6
- Phase with supplementary core drilling · Engineering Geology II, chapter 4
- Limestone attitude: square 900 m, depth at D · Engineering Geology II, chapter 6
- Limestone true thickness: A 600 m N28E, C 400 m S10W · Engineering Geology II, chapter 6 · asked 2×
- Bore hole altitude of fractured bedrock · Engineering Geology I, chapter 5
- Managing three hydropower project risks · Project Engineering, chapter 5
- Hydraulic design of tunnel; alignment criteria · Hydropower Engineering, chapter 6
- Tunnel alignment survey and ideal bridge location · Transportation Engineering II, chapter 5