Short answer

Apply Horton-Einstein formula: n_e = (∑ P_i n_i^{1.5}/P)^{2/3}. Main channel wetted perimeter 52.99 m (n=0.021), flood plains 14.47 m (n=0.039), total P=67.46 m; yields n_e = 0.0254.

A symmetrical compound channel section has main channel geometry of trapezoidal shape with base width 20 m and flood plain both sides as shown in figure below. For a depth of 5 m in symmetrical compound section, determine equivalent roughness using Horton-Einstein Method. Assume Manning's n for the main channel and for the flood plain are 0.021 and 0.039 respectively. [Figure: main channel trapezoid with bed width 20 m, depth 4 m and side slopes 1 vertical to 4 horizontal; flood plains 5 m wide on each side with outer side slope 1 vertical to 2 horizontal]

Horton-Einstein method: each part of the section has the same mean velocity as the whole section, and the equivalent roughness is

ne=[∑Pini3/2P]2/3n_e=\left[\frac{\sum P_in_i^{3/2}}{P}\right]^{2/3}

where PiP_i is the wetted perimeter of the part having roughness nin_i, and P=∑PiP=\sum P_i is the total wetted perimeter.

Assumptions from the figure

Main channel: bed width 20 m, depth 4 m, side slopes 1V:4H. Flood plain on each side: horizontal part 5 m wide at the level of the top of the main channel, with an outer bank 1V:2H. Total depth =5=5 m, so the water depth on the flood plain is 5−4=15-4=1 m. The vertical interface lines between the main channel and flood plain are not counted as wetted perimeter.

 flood plain   ~~~~~~~~~~~~~~~~~~~~~  flood plain
  \ 5 m    (1 m deep)      5 m /
   \_______      ________/
           \    /  4 m deep
            \__/  20 m

Wetted perimeters

  • Main channel (n = 0.021): slope length each side =41+42=4×4.1231=16.492=4\sqrt{1+4^2}=4\times4.1231=16.492 m
Pm=20+2×16.492=52.985 mP_m=20+2\times16.492=52.985\ \text{m}
  • Each flood plain (n = 0.039): horizontal part 55 m + outer slope length 1×1+22=2.2361\times\sqrt{1+2^2}=2.236 m
Pf=5+2.236=7.236 m;both=2Pf=14.472 mP_f=5+2.236=7.236\ \text{m};\quad\text{both}=2P_f=14.472\ \text{m}
  • Total: P=52.985+14.472=67.457P=52.985+14.472=67.457 m.

Equivalent roughness

ne=[52.985 (0.021)1.5+14.472 (0.039)1.567.457]2/3n_e=\left[\frac{52.985\,(0.021)^{1.5}+14.472\,(0.039)^{1.5}}{67.457}\right]^{2/3} (0.021)1.5=0.003043,(0.039)1.5=0.007702(0.021)^{1.5}=0.003043,\qquad (0.039)^{1.5}=0.007702 ne=[0.272767.457]2/3=(0.004043)2/3=0.0254n_e=\left[\frac{0.2727}{67.457}\right]^{2/3}=(0.004043)^{2/3}=0.0254

Answer: equivalent Manning's roughness ne≈0.0254n_e\approx0.0254 (between 0.021 and 0.039, weighted towards the larger perimeter of the main channel).