- 2078 Bhadra · 6 marks
Base width of 20 m high trapezoidal gravity dam
Short answer
Using no-tension condition e = B/6, force and moment equilibrium including full uplift gives quadratic 50B²+400B-11720=0, solving yields B=11.82 m, adopt 12 m. Stress and shear checks confirm safety.
Determine the base width of a 20 m high trapezoidal concrete dam having a vertical upstream face and top width of 5 m. The design water depth is 18 m. There is no tail water. Ignore earthquake, silt and ice loads. Take e = B/6, = 30 MPa, = 80 MPa, = 6 MPa. Specific weights of water and concrete are 10 kN/m³ and 24 kN/m³ respectively. Assume suitable data, if necessary.
Data and assumptions
Height 20 m, vertical u/s face, top width 5 m, water depth m, no tail water. , kN/m³. The resultant must act at the edge of the middle third, (so the heel stress is just zero). Uplift is assumed to act in full: triangular, kN/m² at the heel and zero at the toe (no drainage), which is the safe assumption.
Forces (per metre) for an unknown base width B
- kN at from the toe
- kN at from the toe
- kN at 6 m above the base
- kN at from the toe
Condition
The resultant is at from the toe, so :
Solving the equation numerically gives m (with uplift). Without uplift the same condition gives m.
Check
kN/m. At the stresses are kN/m² MPa, and . These are far below MPa and MPa, so the stress limits do not govern.
Sliding / shear: MPa kN/m², so ; the shear strength is more than sufficient.
Answer: base width ≈ 11.8 m (adopt 12 m); with a vertical u/s face this satisfies and all stress limits.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Gravity dam section: shear stress near toe (2082) · Hydropower Engineering, chapter 4
- Principal stresses at toe and heel with silt and earthquake · Hydropower Engineering, chapter 4
- Gravity dam stresses, principal stress, FOS (2079) · Hydropower Engineering, chapter 4
- Gravity dam forces and stability checks (2081 Baishakh) · Hydropower Engineering, chapter 4
- Gravity dam stability and shear stress at toe (2081) · Hydropower Engineering, chapter 4
- Gravity dam stability: flotation, overturning, sliding · Hydropower Engineering, chapter 4
- Stability of trapezoidal gravity dam (RL 250 m) · Hydro Power, chapter 4
- Stability of gravity dam (crest 1530 m) · Hydro Power, chapter 4
- Stability checks of 50 m trapezoidal dam · Hydro Power, chapter 4
- Stresses in gravity dam with drain holes · Hydro Power, chapter 4