- 2069 Poush · 6 marks
Need for interconnection into a grid
Short answer
Interconnection enhances reliability by sharing reserves, allows economic dispatch of cheapest plants first, reduces combined peak through load diversity, and enables remote hydro to supply cities. High voltage lines minimize I²R losses and voltage drop for long-distance bulk power transfer.
Justify the need of interconnection of different generating stations by high voltage lines to form a power grid.
A power grid is formed by interconnecting generating stations and load centres by high-voltage transmission lines so that all plants operate in parallel and supply the combined load. This interconnection is needed for the following reasons.
- Reliability and continuity: If one generator or plant trips, the others in the grid supply its load; consumers do not lose supply.
- Reduced reserve capacity: Each isolated station needs its own standby units. In a grid, the spinning reserve is shared, so total installed capacity required is lower.
- Economic operation: The most efficient and cheapest plants (e.g. run-of-river hydro) are run at full load and costly plants only at peak, i.e. economic load dispatch.
- Load diversity: Peak demands of different regions occur at different times. Interconnection lowers the combined peak, so less capacity is needed (higher diversity factor).
- Using remote resources: Hydro sites in mountains can supply cities far away; seasonal surplus in one area can supply another.
- Seasonal and cross-border exchange: Nepal exports surplus hydro power in the wet season and imports in the dry season through 132/220/400 kV links with India.
- Larger, efficient units: Grid can absorb large generating units, which have lower cost per kW.
- Stable voltage and frequency: A large system is "stiff"; load changes cause negligible voltage and frequency variation.
- Better use of transmission: Power can flow over parallel paths, reducing overload.
Why high voltage lines
Interconnecting lines carry large power over long distances. Since loss and capacity , only high voltages (132–400 kV) make such transfer efficient and stable.
Plant A ====132 kV==== Plant B
\ /
\== Load centre ==/
||
Tie to neighbour grid
Drawbacks such as higher fault levels and spread of disturbances are handled by good protection and control, so interconnection is fully justified.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Need for different voltage levels · Power System Analysis I, chapter 1 · asked 3×
- Conductor volume vs voltage and power factor · Power System Analysis I, chapter 1
- Typical power system with voltage levels · Power System Analysis I, chapter 1
- Reactive power proportional to voltage drop · Power System Analysis I, chapter 6
- Need and methods of reactive power compensation · Power System Analysis I, chapter 6 · asked 2×
- Voltage across string discs is not uniform · Power System Analysis I, chapter 2 · asked 3×
- Justify higher voltage/more circuits for more power · Transmission and Distribution System Design, chapter 2
- Voltage and circuits for 250 MW grid connection · Transmission and Distribution System Design, chapter 2
- Voltage, circuits and discs for 260 MW grid link · Transmission and Distribution System Design, chapter 2
- Voltage and circuits for 180 MW grid link · Transmission and Distribution System Design, chapter 2