Road base void ratio specification
Short answer
Dry unit weight is 15.65 kN/m³ giving void ratio 0.692, which is below the specified 0.75, so the bill should be passed.
You are appointed as a supervisor for a road construction project. During the construction process, the contractor compacted the base course of the road and the average water content for the test samples was found to be 15%, the specific gravity of soil grains = 2.7 and unit weight of soil = 18 kN/m³. The specification requires that void ratio < 0.75. If you have to pass the bill for that task according to the specification, would you pass the bill for that work?
Given
, , kN/m³, specified . Take kN/m³.
Solution
Dry unit weight:
Void ratio from :
Since , the compaction meets the specification.
Decision: pass the bill for this base course work. (A check using the average of several samples is taken as given; individual samples should also be checked.)
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Pycnometer data, water content, γsub · Soil Mechanics, chapter 2
- Compacted soil 17 kN/m³, OWC 16% · Soil Mechanics, chapter 5 · asked 2×
- Compacted soil 18 kN/m³, porosity and ZAV · Soil Mechanics, chapter 5 · asked 2×
- Road compaction specification, sand cone · Soil Mechanics, chapter 5
- Compacted soil 18 kN/m³, saturation · Soil Mechanics, chapter 5
- Phase diagram; void ratio, saturation · Soil Mechanics, chapter 2
- Contractor asks supervisor to prepare running bill · Engineering Professional Practice, chapter 7
- Volume-moisture relation; specific gravity · Sanitary Engineering, chapter 8
- Importance of specification in road projects · Construction Management, chapter 12
- Quality, moisture content, specific volume of mixture · Fundamental of Thermodynamics & Heat Transfer, chapter 3