Quality control: test materials, weigh batching, fixed w/c, slump checks per batch, proper compaction and curing, cube testing (mean of 4 consecutive ≥ fck+0.825s, individual ≥ fck-4 MPa). Slump test: fill cone in 4 layers, 25 strokes each, lift, measure subsidence; true slump valid. Typical slump 25-75 mm.
How do you assure the quality control of concrete at site? Explain slump test in detail.
Quality control of concrete at site (IS 456 Clauses 15 and 16)
- Materials: test the cement (IS 4031), aggregates (IS 2386: grading, bulking, moisture), water and admixtures before use; store them properly (cement off the ground, aggregates kept separate).
- Mix proportioning: use a design mix with weigh batching; correct for moisture, bulking and absorption; keep the w/c fixed.
- Mixing and transport: use mechanical mixers (mixing for at least 2 min); avoid segregation; place within the time allowed.
- Workability checks: slump test on every batch or truck.
- Placing, compaction and curing: proper compaction (vibrators), clean formwork, cover blocks, and curing for at least 7 days (10 days for PPC; IS 456 cl. 13.5.1).
- Sampling and strength tests: 150 mm cubes, sampled as per IS 456 cl. 15.2.2 (1 sample for 1-5 m, 2 for 6-15 m, 3 for 16-30 m, and so on); each sample gives a test result equal to the average of 3 cubes, tested at 7 and 28 days. Acceptance by cl. 16.1 and Table 11 (for M20 and above): the mean of any 4 consecutive test results (or N/mm, whichever is greater), and every individual test result N/mm ( N/mm for M15).
- Records, supervision, and calibration of equipment; core tests or NDT (rebound hammer, UPV) in case of doubt.
Slump test in detail (IS 1199)
Apparatus: slump cone (bottom diameter 200 mm, top 100 mm, height 300 mm), 16 mm tamping rod 600 mm long, base plate, scale.
Procedure: place the cleaned, moistened cone on the base plate; fill it in four layers, each about one-quarter of the height; tamp each layer with 25 strokes of the rod; strike off the top; lift the cone vertically within 5-10 s; measure the subsidence (the slump) from the top of the mould to the highest point of the subsided concrete.
Results: true slump (valid), shear slump (repeat the test) and collapse slump (too wet). Typical slump values: 25-75 mm for lightly reinforced sections, 50-100 mm for heavily reinforced sections. The test is quick, but not suitable for very dry or very wet mixes. A variation of more than ±25 mm from the design value indicates a change in water content or grading.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Quality control of concrete at site · Concrete Technology and Masonry Structure, chapter 5 · asked 11×
- Workability and slump test procedure · Concrete Technology and Masonry Structure, chapter 3
- Role and quality of water in concrete · Concrete Technology and Masonry Structure, chapter 1 · asked 3×
- Asphalt concrete construction and quality control · Transportation Engineering II, chapter 3 · asked 5×
- Test life cycle in quality control · ICT Project Management, chapter 10
- Quality; QA vs QC; site engineer steps · Project Engineering, chapter 4
- Site engineer uses weaker mortar and concrete mix · Engineering Professional Practice, chapter 7
All Concrete Technology and Masonry Structure chapter 3 questions →