- Asked 2/27
- 2076 Chaitra · 12 marks
Flood hydrograph from 4-h UH, 50 m3/s base
Short answer
Derive 2-h unit hydrograph from the 4-h UH using S-curve method. Convolve with rainfall excesses of 1 cm (0–2 h) and 2 cm (4–6 h) and add baseflow 50 m³/s. Peak flood is approximately 550 m³/s at 10 h, returning to baseflow at 28 h.
The ordinate of 4-h UH are given:
| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Ordinate (m/s) | 0 | 30 | 100 | 150 | 200 | 160 | 120 | 80 | 40 | 30 | 20 | 6 | 0 |
A catchment has rainfall of 3.5 cm, 2.5 cm and 4.5 cm in three consecutive two hour period. Assuming an average -index of 1.25 cm/hour and base flow of river is 50 m/s, determine the flood hydrograph of the catchment.
Approach. The rain falls in three 2-h periods, but the given UH is for a 4-h rain. A 4-h UH cannot be used directly for 2-h excess periods, so first derive the 2-h UH by the S-curve method, then apply the rainfall excesses by superposition.
Step 1: Rainfall excess per 2-h period
Loss per period = φ × 2 h = 1.25 × 2 = 2.5 cm.
| Period | Rain (cm) | Loss (cm) | Excess (cm) |
|---|---|---|---|
| 0 – 2 h | 3.5 | 2.5 | 1.00 |
| 2 – 4 h | 2.5 | 2.5 | 0.00 |
| 4 – 6 h | 4.5 | 2.5 | 2.00 |
Step 2: 2-h UH from the 4-h UH (S-curve)
The S-curve is , using the ordinates at 2-h steps. The 2-h UH is
The two interleaved series (t = 0, 4, 8, … and t = 2, 6, 10, …) of the plain sum settle at 480 and 456 m³/s, because the given table is not perfectly consistent. The S-curve therefore zig-zags, and subtracting it directly gives erratic (even negative) 2-h ordinates. So a smooth S-curve is drawn through the points. It must level off at m³/s.
| t (h) | 4-h UH | S(t) plain sum | S(t) smooth curve | 2-h UH = 2[S(t) − S(t−2)] |
|---|---|---|---|---|
| 0 | 0 | 0 | 0 | 0 |
| 2 | 30 | 30 | 40 | 80 |
| 4 | 100 | 100 | 100 | 120 |
| 6 | 150 | 180 | 190 | 180 |
| 8 | 200 | 300 | 280 | 180 |
| 10 | 160 | 340 | 350 | 140 |
| 12 | 120 | 420 | 400 | 100 |
| 14 | 80 | 420 | 430 | 60 |
| 16 | 40 | 460 | 448 | 36 |
| 18 | 30 | 450 | 460 | 24 |
| 20 | 20 | 480 | 467 | 14 |
| 22 | 6 | 456 | 468 | 2 |
| 24 | 0 | 480 | 468 | 0 |
Check: Σ(2-h UH) = 936 m³/s = Σ(4-h UH), so both UHs carry the same runoff volume of 1 cm.
Step 3: Convolution with the 2-h UH
The middle period gives no excess, so
| t (h) | 2-h UH (m³/s) | 1 × U₂(t) | 2 × U₂(t−4) | Base | Q (m³/s) |
|---|---|---|---|---|---|
| 0 | 0 | 0.0 | 0.0 | 50.0 | 50.0 |
| 2 | 80 | 80.0 | 0.0 | 50.0 | 130.0 |
| 4 | 120 | 120.0 | 0.0 | 50.0 | 170.0 |
| 6 | 180 | 180.0 | 160.0 | 50.0 | 390.0 |
| 8 | 180 | 180.0 | 240.0 | 50.0 | 470.0 |
| 10 | 140 | 140.0 | 360.0 | 50.0 | 550.0 |
| 12 | 100 | 100.0 | 360.0 | 50.0 | 510.0 |
| 14 | 60 | 60.0 | 280.0 | 50.0 | 390.0 |
| 16 | 36 | 36.0 | 200.0 | 50.0 | 286.0 |
| 18 | 24 | 24.0 | 120.0 | 50.0 | 194.0 |
| 20 | 14 | 14.0 | 72.0 | 50.0 | 136.0 |
| 22 | 2 | 2.0 | 48.0 | 50.0 | 100.0 |
| 24 | 0 | 0.0 | 28.0 | 50.0 | 78.0 |
| 26 | 0 | 0.0 | 4.0 | 50.0 | 54.0 |
| 28 | 0 | 0.0 | 0.0 | 50.0 | 50.0 |
Answer: peak flood ≈ 550 m³/s at t = 10 h; the flow returns to the base flow of 50 m³/s at t = 28 h. The last column of the table is the flood hydrograph. The ordinates depend slightly on how the smooth S-curve is drawn, so they are approximate.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Flood hydrograph from 4-h UH, three 2-hr rainfalls · Engineering Hydrology, chapter 5 · asked 2×
- 2-hr UH and flood hydrograph from storm · Engineering Hydrology, chapter 5
- Flood hydrograph from 6-h UH, three storms · Engineering Hydrology, chapter 5
- Storm hydrograph from 6-h UH, 3-hr storm · Engineering Hydrology, chapter 5 · asked 2×
- S-curve: 2-hr hydrograph from 4-hr UH · Engineering Hydrology, chapter 5
- Flood hydrograph from 6-hr UH, two storms · Engineering Hydrology, chapter 5
- Flood hydrograph from 2-h UH, 5.2 cm rainfall · Engineering Hydrology, chapter 5
- Initial line design for 200 MW over 120 km · Transmission and Distribution System Design, chapter 2
- Voltage, circuits, discs: 200 MW, 160 km · Transmission and Distribution System Design, chapter 2
- Bresenham: line (20,10) to (30,18) · Computer Graphics, chapter 2 · asked 4×
- AVL tree for 10, 20, 30, 35, 50, ... · Data Structure and Algorithm, chapter 6