- 2071 Chaitra · 8 marks
Time area method for runoff hydrograph
Short answer
The time-area method computes direct runoff hydrograph by convolving effective rainfall blocks with inter-isochrone areas, ignoring storage: Qn = 2.78 ∑ rᵳ Aₙ₋₊ᵳᵳ/Δ t (area in km², r in cm, Δ t in h). It overestimates peaks; Clark improved it by adding linear reservoir routing to account for storage.
Explain in detail the time area method for estimating runoff hydrograph.
The time-area method estimates the direct runoff hydrograph at the outlet of a catchment from effective rainfall, taking into account only the translation of runoff to the outlet and ignoring storage effects.
Basic idea
- Lines of equal travel time to the outlet (isochrones) are drawn at interval : .
- The area between two consecutive isochrones is . Rain falling in reaches the outlet in the first interval, in in the second interval, and so on. The last strip takes time (time of concentration).
- The plot of cumulative area against time (or the histogram of strip areas) is the time-area diagram.
Time-area histogram
Area
A3 | ____
A2 | ___| |___
A1 | | | | |
| | | | |___
+-+----+----+----+---> t
0 Δt 2Δt 3Δt tc
Procedure
- Prepare the isochrone map and find the strip areas .
- Convert the effective rainfall hyetograph into blocks (cm or mm) of duration .
- The discharge at the end of interval is the sum of contributions of every rainfall block over its corresponding strip:
i.e. for in cm and in h. For example, , , . 4. Plot against time to get the direct runoff hydrograph.
The calculation is a convolution of the rainfall blocks with the area strips (reversed order), and the base flow is added afterwards.
Limitations
- Storage (channel and catchment) is ignored, so peaks are overestimated and the hydrograph is too steep.
- Isochrones are hard to draw accurately and the velocity is assumed constant, independent of flow depth and rainfall intensity.
- Uniform rainfall over each strip is assumed.
Clark improved the method by routing the result through a linear reservoir to include storage.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Direct runoff hydrograph analysis, 4250-acre basin · Engineering Hydrology, chapter 5
- Derive 4-hr UH from triangular direct runoff hydrograph · Engineering Hydrology, chapter 5
- Rainfall, lag time and time of concentration from hydrograph · Engineering Hydrology, chapter 5
- Basin area from 4-h unit hydrograph ordinates · Engineering Hydrology, chapter 5
- Time-area method with histogram, drawbacks · Engineering Hydrology, chapter 7
- Effect of urbanization on UH and storm runoff · Engineering Hydrology, chapter 5 · asked 2×
- Runoff from a 20 ha built-up area · Sanitary Engineering, chapter 2
- Time of concentration and time-area graph · Sanitary Engineering, chapter 2 · asked 3×
- Components of detail estimate report (road) · Estimating and Costing, chapter 5
- Estimating sewage quantity for a city · Sanitary Engineering, chapter 2